EFTA02454377.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Larry Visoski
Sent:
Monday, August 8, 2016 5:40 PM
To:
Je vacation
Subject:
Gulfsream wood
Jeffrey
Gulfstream Savanah quick numbers, $600k to $700k for all wood in the GIV, es=imate is 10 to 12 weeks downtime,.
December this year, we will be due landing gear corrosion inspection, S day d=wn time, maybe Eric could accomplish
cabin door refinish, and wood panels i= need of immediate attention. Hawthorne Aviation in Islip could accomplish
m=dium GIV maintenance requirements.
Our 72 month inspection is due in 21 months from now, approx June 2018,.
Our Engines are due shop Visit as well Sept 2018.
Thx
Larry
Sent from my iPhone=<?xml version=.0" encoding=TF-8"?> <IDOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN"
"http://www.apple.com/DTDs/PropertyList-1.0.dtd">
<plist version=.0">
<dict>
<key>conversation-id</key>
<integer>72562</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1470678033</integer>
<key>flags</key>
<integer>8590195713</integer>
<key>gmail-label-ids</key>
<array>
<integer>2</integer>
</array>
<key>remote-ick/key>
<string>634392</string>
</dict>
</plist>
1
EFTA_R1_01556094
EFTA02454377
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02454377.pdf |
| File Size | 60.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,201 characters |
| Indexed | 2026-02-12T17:29:21.600463 |