EFTA02456062.pdf
Extracted Text (OCR)
From:
Larry Visoski
Sent:
Wednesday, July 20, 2016 3:46 PM
To:
Je vacation; Rich Kahn
Subject:
Nautica update
Attachments:
IMG_6331.1PG; Untitled attachment 00136.txt; IMG_6332JPG; Untitled attachment
00139.txt; IMG_6333JPG; Untitled attachment 00142.txt; IMG_6330.1PG; Untitled
attachment 00145.txt; IMG_6329JPG; Untitled attachment 00148.txt
Update:
Side panel 90degree floor bracket to be epoxy this week, decor side panel in=tall by Friday, Zed does not need Boat to
fabricate rear bench seat, he will take measuremen=s and build a removable rear bench seat, for ease of access to oil
filter a=d lower Bilge pump maintenace.
I feel confident I should have boat in paint shop by Aug 1st„ -Aug 1st Boat in Paint shop -three weeks in Paint shop -out
of paint shop August 21st -Silvio installs new tubes 1 week, Ready to ship to LSJ by Sept 1st. ?
(Every estimate I've been given except Silvio out Tube guy, has been wrong). I hope I can deliver Boat to Tropical to
Ship by Sept 1.
1
EFTA_R1_01559079
EFTA02456062
Document Preview
Document Details
| Filename | EFTA02456062.pdf |
| File Size | 50.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,035 characters |
| Indexed | 2026-02-12T17:29:28.511768 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.