Back to Results

EFTA02456062.pdf

Source: DOJ_DS11  •  email/external  •  Size: 50.7 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Larry Visoski Sent: Wednesday, July 20, 2016 3:46 PM To: Je vacation; Rich Kahn Subject: Nautica update Attachments: IMG_6331.1PG; Untitled attachment 00136.txt; IMG_6332JPG; Untitled attachment 00139.txt; IMG_6333JPG; Untitled attachment 00142.txt; IMG_6330.1PG; Untitled attachment 00145.txt; IMG_6329JPG; Untitled attachment 00148.txt Update: Side panel 90degree floor bracket to be epoxy this week, decor side panel in=tall by Friday, Zed does not need Boat to fabricate rear bench seat, he will take measuremen=s and build a removable rear bench seat, for ease of access to oil filter a=d lower Bilge pump maintenace. I feel confident I should have boat in paint shop by Aug 1st„ -Aug 1st Boat in Paint shop -three weeks in Paint shop -out of paint shop August 21st -Silvio installs new tubes 1 week, Ready to ship to LSJ by Sept 1st. ? (Every estimate I've been given except Silvio out Tube guy, has been wrong). I hope I can deliver Boat to Tropical to Ship by Sept 1. 1 EFTA_R1_01559079 EFTA02456062

Document Preview

Extracted Information

People Mentioned

Dates

Document Details

Filename EFTA02456062.pdf
File Size 50.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,035 characters
Indexed 2026-02-12T17:29:28.511768

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files