EFTA02463495.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Wednesday, May 11, 2016 5:22 PM
To:
Richard Kahn
Subject:
Re: Zorro Ranch / CenturyLink Quote
ok
On Wed, May 11, 2016 at 7:17 PM, Richard Kahn
wrote:
i finally heard back from Hector this morni=g who did not have any concerns about attached quote from future
tech
=e did pose a few questions (see below)
quote attached i= for 104,431 (travel and lodging not included estimated at 15,000)
there is approximately 15,000-20,000 of equipment and labor that will no= be needed if sandia to main house
works however this will only be known a=ter field site survey is completed
attached timeline was from 2.= weeks ago which will push completion date to approximately 2nd week of Ju=y
if you want to proceed i would like to begin process soon so e=erything is complete before your August visit
note - i also will=attempt to negotiate bid once you give me direction
please advis=
thank you
Sequence of Events:=/span>
1.
Week of 4/25=16
<roan style="font-size:11ptfont-family:Calibri,sans-serifla. =C* FT provide quote to Zorro Ranch
(4/25=16)
b. Q=A0 Zorro Ranch review quote and approve (1-= days)
<=pan style="font-size:11ptfont-family:Calibri,sans-serir>c. =C* Future Tech to start the FCC
licensin= process
Q=A0
=C24,
4>=A0
i. 4>=A0 Upon written approval of quote</=pan>
=C24>
4>=A0
=C* ii.
Proc=ss will take 1 week to get initial channels
assigned<=span>
=C240
4,=AO
=C2Qiii.
Entire licensing proc=ss will take 4.5 weeks
4,=A0
FCC provide conditional chan=el approval
=span>apan style="font-size:7ptfont-familyfTimes New Roman"> =C2*
Q=A0
=C24>
i. =C* Remaining period of time is just paperwork =rocess to finalize license
b.
Future Tech order =quipment based off of conditional channel approval to get order in process=u>
=C*
4,=ACI
=C*
i. =C* 4-6 week lead time after receipt of order=/span>
3. 4>=A0 Week of 5/9 or 5/16<=span>
a.
=/span>Future Tech to conduct Field Site Survey
4.
=/span>Week of 5/23
EFTA_R1_01570511
EFTA02463495
a.
<=pan style="font-size:llpt;font-family:Calibri,sans-serif'>Future Tech to=complete field report
b.a.
Deploy to market to in=tall solution
Please note the above is a HIGH LEVEL timeli=e to help provide an outline for the path forward.
Richard Kahn
HBRK Associates Inc.
IMP
From: Hector C=ntron <HCintron=Choice.vi <mail
>
Subject: RE: Zorro Ranch / Ce=turyLink Quote
Date: May 11, 2016 at 5:33:01=AM EDT
To:=C2*Richard Kahn <ri
<=span>
Cc: </=pan>Brice Gordon
<=iv link="blue" vlink="purple" lang="EN-US">
Hi Richard,
> >
Is there anythi=g specific that you have concerns? Everything looks fine but just a =eminder,
just like GSJ, I'm more in the configuration aspect and n=t the physical installations.
Also depending=on what your future needs are:
•
<=span>what are your internet bandwidth plans for 2-4 years
* =C2*
is the int=rnet for only the main residence?
•
Are there plans to redistribute in other parts of t=e ranch?
</=pan>
From:=/span>40=AORichard Kahn Imailto
Sent: Friday, A=ril 29, 2016 12:40
To: Hector Cintron
Cc: Br=ce Gordon
Subject: Fwd: Zorro Ranch / Centurylink Quote<=u>
<=u>
Email=received from outside of the ATN domain. Use caution before using
links/at=achments.can you please review attached and provide us with your th=ughts
2
EFTA_R1_01570512
EFTA02463496
thank you</=>
Richard Kahn
Begin forwarded message:
<=iv style="margin-top:0px;margin-ri ht:0 rmar in-bottom:0 x•margin-
left:=px">From: Richard Ka=n <richard=ahnl2@gmail.com <mailt
Subject: FW: Zorro Ranch / CenturyLink Quote</=>
Date: April 25, 2016 at 6:25:27 PM EDT
To: Jeffrey Epstein <jeevacation@gmail.com<b7»
=div style="font-family:Calibri;font-size:11pttext-align:left;border-wid=h:lpt medium
medium•border-st le:solid none none addin :3 t 0in 0in•borde=-to -colorrgb(181,196,223)">From:
<mailt
Date:
on y,
,
a
:
To: Richard Kahn
Cc: Brice Gordon
wave
Rumore
Peter Cappiello
"
"
Walter Tanner
Chris Cappiello
Subject: RE: Zorro Ranch / CenturyLink Q=ote
I hope all is well with you.=/u>
Per our discussion last week we have finalized our design =or this project to support the
requested 1 GBPS solution from Day 1. The incremental cost from 300 MB to 1 GB is all related to software licensing
=osts on this solution and is negligible to the total project. On that basi= we just designed this to 1 GBPS day one.
3
EFTA_R1_01570513
EFTA02463497
<= class="MsoNormal">
I have=attached the link design for you and have provided a summary below.
=/span>
Within this plan we would order the required equ=pment (2 links + 1 spare set) and
licensing (3 links) to expedite the deli=ery of service. If we were to try and break this into PLAN A and PLAN B it could
=elay things by a whole order of magnitude and increase your cost by more t=an the extra FCC license cost we are
putting in day 1 ($4k investment to s=reamline the project). By taking this approach we can speed up the deployment
timeline and cover all our ba=es so that when we come out to do the install we have the solution in plac=.
1.
Primary Link Design
4>=A0
Sandia Crest to Main Residence
=C2*
4P=A0
=C2* i.
11 GHz with 4' antennas
<=pan style="font-style:normal;font-variant:normal;font-
weight:normal;font=size:7pt;line-height:normal;font-familyfTimes New Roman'"> =C240
*=A0
=C2.
NOTE: If this "Primary S=lution" is successful you would have 1 extra set of spare equipmen= (2 total), as the second link
from ZDC Main to Main Residence would not be used.</=>
2.
Secondary Link Design
a.
Sandia Crest to ZDC
40=ACI
=C2*
40=A0 i.
11 GHz with 4' antennas
b=4)=A0
ZDC Tower to Main Residence
40=A0
=C2*
4=A0 i.
11 GHz with 2' antennas
<=pan style="font-style:normal;font-variant:normal;font-
weight:normal;font=size:7pt;line-height:normal;font-family:limes New Roman"5 =C2*
l>=A0
=C2*
ii.
NOTE: if we were to go with seco=dary solution based upon the primary solution not working from a line of site
perspective, you would have 1 set of spare equipment.
Quote Assumptions:
1. =C24, Travel costs — all travel costs (Flights, car rentals, hote=) to be billed back to
customer at cost +15%</=>
2.
Shipping costs — all shipping costs to be billed back to cu=tomer at cost +15%
4
EFTA_R1_01570514
EFTA02463498
3. =C2* Permitting — the end user will handle any necessary permits=(if required)
4. *=A0 Consumables — the attached quote is an estimate and will be=verified based
upon site survey
<=pan>5.Site Readiness — FT assumes that the sites have tower space= cabinet space for
power supplies, power available and switch/router in pl=ce to take receipt of service
Sequence of Eve=ts:
1.
Week of 4/25/16
a.
FT provide quote to Zorro Ranch (4/25/16)
b. 4>=A0 Zorro Ranch review quote and approve (1-2 days)
c. 4>=A0 Future Tech to start the FCC licensing process=/span>
=C2*
*=A0
=C2*
i.
Upon written approval of quote=/u>
=C2*
40=A0
=C2*
ii.
Process will take 1 week to get =nitial channels
assigned
=C2*
*40
iii.
Entire licensing process will t=ke 4.5 weeks
d.
Zorro Ranch issue PO and provide payment (1-2 days)4=pan>
2.
Week of 5/2/16
a.
FCC provide conditional channel approval
=C240.
40=A0
=C240 i.
Remaining period of time is just =aperwork
process to finalize license
b.
Future Tech order equipment based off of conditional channel approv=l to get
order in process
=C2*
40:=A0
=C2* i.
4.6 week lead time after receipt =f order
3. =C2* Week of 5/9 or 5/16
a.
Future Tech to conduct Field Site Survey
4.
Week of 5/23
a.
Future Tech to complete field report
b.
4>=A0 Future Tech to order consumable materials based upon field report
EFTA_R1_01570515
EFTA02463499
5.
=C240 Week of 6/16 (Estimated based upon the above chain of events=and
equipment lead time)
a.
Deploy to market to install solution
Plea=e note the above is a HIGH LEVEL timeline to help provide an outline for t=e path
forward.
From: Richard Kahn
Sent: Friday, April 2
To: Chris Cappiel=
Cc: Brice Gordon
P,
al=ng
re
"
Subject: Re: Zorro=Ranch / CenturyLink Quote
ok i would rush a= much as possible as our principal is very anxious to move this project
thank you
Richard Kahn
HBRK Associates Inc.
tel
fax
=C2.
=/div>
6
EFTA_R1_01570516
EFTA02463500
On Apr 22, 2016, at 1:49 PM= Chris Cappiello
<mailto
> > wrote:
<=div>
Hey Richard,
I =poke to Brice yesterday to let him know it would probably be the middle
of=next week before we get a proposal over. We are running a couple designs w=th different products to get to 1 GB
with the availabilities we are looking for. If you=need it sooner let me know and I will apply some internal pressure.=u>
Best regards,</=>
=C24,
Chris Cappiello
Director of Business Development =/u>
Future =echnologies Venture, LLC
<tela
<mailto:
E
<image001.png>
From= =ichard Kahn I=ailtc
<=a> <mailto
COM>
Sent: Friday, April 22, 2016 1:09 PM
To: Chris Cappiel=o
<mailto:ccappiello@futuretechlIc.com»
Cc: Brice Gordon Ma
<mailto
Subject: Re: Zorro=Ranch / CenturyLink Quote
7
EFTA_R1_01570517
EFTA02463501
any update on pro=osal?
please advise=/u>
thank you
=div>
Richard Kahn
HBRK Associates Inc.
tel
fa
cell
< = >
=/div>
On Apr 18, 2016, at 8:29 AM= Chris Cappiello
<mailto
> wrote:
<=div>
Working on updating the design now.
<= class="MsoNormal">Best regards,=/u>
<=span>
From: Brice Gordon (mailto
Sent: Sunday, April 17, 2016 7:42 PM
To: Chris Cappiel=o
<mailto
>
8
EFTA_R1_01570518
EFTA02463502
<mailto:
House=u>
<mailto
Cc: Hector Cintron
= Richard Kahn
>; ZDC
Subject= Re: Zorro Ranch / CenturyLink Quote
Chr=s
c=p>
attached photo's for your referenc=
Ir/u>
Coordinates where taken this morn=ng from each location
l=do have some concern regarding direct link from Sandia Crest to Main
Any other information y=u may require please let me know
regards=Brice
au>
Main House Towerau>
35-16-42" N
105-58'- 13" W
Elevation 6726 ft
=C2*
35-14'-13&quo=; N
105-58'-46"= W
Elevation 6590 ft=/u>
9
EFTA_R1_01570519
EFTA02463503
</=iv>
Sandia Crest Tower
=idly>
35-12'-60"
106-27-7"
Elevation 10620 ft
On Fri, Apr=15, 2016 at 5:25 PM, Zorro Ranch
<mailto
> wrote:
Chris
I will confirm all coordinates this weekend when back on sit=
I will also send=photo if MH location
Thank you and have a great Weekend
Thank you
Regards Brice
40=A0
Sent from my iPhone=u>
On Apr 15, 2016, at 3:28 PM, Chris Cappiello
<mailto
> >= wrote:
Brice,
Please see the comments below and report back. I=E240.II put a quote
together based on your response about the Sandia Cr=st coordinates and if you would rather have one link direct to the
main residence rather than going through ZDC.=/u>
10
EFTA_R1_01570520
EFTA02463504
=p class="MsoNormal">
=C24>
I think Coordin=tes for Sa=dia Creat tower are not accurate, please see below
screenshot. I have assu=ed a tower out of multiple towers on the peak — GE file attached, =lease verify coordinates.
<=pan style="font-family:Arial,sans-serif;color:rgb(68,84,106)">
Ran at 11 GHz in 40 Mhz channel with HAA=
Sandia Creat tower - ZDC Main tower: 26.8 mile</=>
99.997% at 227 Mbps and 99.992% at 297 Mbps with 3ft-3f= dishes
<=p>
ZDC Main tower - Main Residence: 2.17 mile
99=999% at 297 Mbps with 2ft-2ft dishes.
Best regards,
=/P>
</a
Chris Cap=iello
Director of Business Development
Future Technologies Ventu=e, LLC
P:
mai ltc
l
<mailt
mailto
o
E: From: Zorro Ranch I <mailto
Sent: Friday, April 15 2016 3:17 PM
To: Chris Cappiel=o tina
>; Hector Cintron
mailto
Cc
mailto
>; ZDC
Subject= Fwd: Zorro Ranch / CenturyLink Quote
target=>
11
EFTA_R1_01570521
EFTA02463505
To =11
Attached from =entury link for your review and comment
=p class="MsoNormal">Thank you
Regards Brice
Sent from my iPhone
Begin forwarded message:
• &q=ot;Armstrong, Annette"
<mailto
<=>Date: April 15, 2016 at 1:51:45 PM EST
To: "'Zorro=Ranch'"
>
Subject: Zorro Ranch / CenturyLi=k Quote
Good Mo=ning Brice,
Attached you will find pricing for the Wav= Fiber Circuit to be located on Sandia
Crest. c=p>
Charges are waived 100% $0.00
same for 100M or 200M circuit.
for review upon your approval.
Monthly Recurring 200M $4,500.00 3yr Term and Non-Recurrin= Construction
I did request pricing for 100M Circuit on = 3yr term, and the port price was the
Let us know if you have any questions or c=ncerns. I can have the contract ready
Annette Armstro=g
Sr. Account Executive
CenturyLink Business Technology Solut=ons
Office:
I E-mail:=
<mailto:
=u>
<image004.jpg>
12
EFTA_R1_01570522
EFTA02463506
This communication is the property=of CenturyLink and may contain
confidential or privileged information. Una=thorized use of this communication is strictly prohibited and may be
unlaw=ul. If you have received this communication in error, please immediately notify the s=nder by reply e-mail and
destroy all copies of the communication and any a=tachments.
<Link details_2016.04.15.pdf>
<Zorro Ranch.kml>
<=>
=p class="MsoNormal">--
</=iv>
=/P>
</=iv>
please note
confidential, may be=attorney-client privileged, may
constitute inside information, and is i=tended only for
the use of the addressee. It is the property of
JEE<=r>Unauthorized use, disclosure or copying of this
communication or any =art thereof is strictly prohibited
and may be unlawful. If you have rec=ived this
communication in error, please notify us immediately by
13
EFTA_R1_01570523
EFTA02463507
re=urn e-mail or by e-mail to jeevacation@gmail.com
<mailto:jeevacation@gmail.com> , and
destroy this communication an= all copies thereof,
including all attachments. copyright -all rights r=served
14
EFTA_R1_01570524
EFTA02463508
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02463495.pdf |
| File Size | 681.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 13,775 characters |
| Indexed | 2026-02-12T17:40:39.200750 |