Back to Results

EFTA02463495.pdf

Source: DOJ_DS11  •  Size: 681.7 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: jeffrey E. <jeevacation@gmail.com> Sent: Wednesday, May 11, 2016 5:22 PM To: Richard Kahn Subject: Re: Zorro Ranch / CenturyLink Quote ok On Wed, May 11, 2016 at 7:17 PM, Richard Kahn wrote: i finally heard back from Hector this morni=g who did not have any concerns about attached quote from future tech =e did pose a few questions (see below) quote attached i= for 104,431 (travel and lodging not included estimated at 15,000) there is approximately 15,000-20,000 of equipment and labor that will no= be needed if sandia to main house works however this will only be known a=ter field site survey is completed attached timeline was from 2.= weeks ago which will push completion date to approximately 2nd week of Ju=y if you want to proceed i would like to begin process soon so e=erything is complete before your August visit note - i also will=attempt to negotiate bid once you give me direction please advis= thank you Sequence of Events:=/span> 1. Week of 4/25=16 <roan style="font-size:11ptfont-family:Calibri,sans-serifla. =C* FT provide quote to Zorro Ranch (4/25=16) b. Q=A0 Zorro Ranch review quote and approve (1-= days) <=pan style="font-size:11ptfont-family:Calibri,sans-serir>c. =C* Future Tech to start the FCC licensin= process Q=A0 =C24, 4>=A0 i. 4>=A0 Upon written approval of quote</=pan> =C24> 4>=A0 =C* ii. Proc=ss will take 1 week to get initial channels assigned<=span> =C240 4,=AO =C2Qiii. Entire licensing proc=ss will take 4.5 weeks 4,=A0 FCC provide conditional chan=el approval =span>apan style="font-size:7ptfont-familyfTimes New Roman"> =C2* Q=A0 =C24> i. =C* Remaining period of time is just paperwork =rocess to finalize license b. Future Tech order =quipment based off of conditional channel approval to get order in process=u> =C* 4,=ACI =C* i. =C* 4-6 week lead time after receipt of order=/span> 3. 4>=A0 Week of 5/9 or 5/16<=span> a. =/span>Future Tech to conduct Field Site Survey 4. =/span>Week of 5/23 EFTA_R1_01570511 EFTA02463495 a. <=pan style="font-size:llpt;font-family:Calibri,sans-serif'>Future Tech to=complete field report b.a. Deploy to market to in=tall solution Please note the above is a HIGH LEVEL timeli=e to help provide an outline for the path forward. Richard Kahn HBRK Associates Inc. IMP From: Hector C=ntron <HCintron=Choice.vi <mail > Subject: RE: Zorro Ranch / Ce=turyLink Quote Date: May 11, 2016 at 5:33:01=AM EDT To:=C2*Richard Kahn <ri <=span> Cc: </=pan>Brice Gordon <=iv link="blue" vlink="purple" lang="EN-US"> Hi Richard, > > Is there anythi=g specific that you have concerns? Everything looks fine but just a =eminder, just like GSJ, I'm more in the configuration aspect and n=t the physical installations. Also depending=on what your future needs are: • <=span>what are your internet bandwidth plans for 2-4 years * =C2* is the int=rnet for only the main residence? • Are there plans to redistribute in other parts of t=e ranch? </=pan> From:=/span>40=AORichard Kahn Imailto Sent: Friday, A=ril 29, 2016 12:40 To: Hector Cintron Cc: Br=ce Gordon Subject: Fwd: Zorro Ranch / Centurylink Quote<=u> <=u> Email=received from outside of the ATN domain. Use caution before using links/at=achments.can you please review attached and provide us with your th=ughts 2 EFTA_R1_01570512 EFTA02463496 thank you</=> Richard Kahn Begin forwarded message: <=iv style="margin-top:0px;margin-ri ht:0 rmar in-bottom:0 x•margin- left:=px">From: Richard Ka=n <richard=ahnl2@gmail.com <mailt Subject: FW: Zorro Ranch / CenturyLink Quote</=> Date: April 25, 2016 at 6:25:27 PM EDT To: Jeffrey Epstein <jeevacation@gmail.com<b7» =div style="font-family:Calibri;font-size:11pttext-align:left;border-wid=h:lpt medium medium•border-st le:solid none none addin :3 t 0in 0in•borde=-to -colorrgb(181,196,223)">From: <mailt Date: on y, , a : To: Richard Kahn Cc: Brice Gordon wave Rumore Peter Cappiello " " Walter Tanner Chris Cappiello Subject: RE: Zorro Ranch / CenturyLink Q=ote I hope all is well with you.=/u> Per our discussion last week we have finalized our design =or this project to support the requested 1 GBPS solution from Day 1. The incremental cost from 300 MB to 1 GB is all related to software licensing =osts on this solution and is negligible to the total project. On that basi= we just designed this to 1 GBPS day one. 3 EFTA_R1_01570513 EFTA02463497 <= class="MsoNormal"> I have=attached the link design for you and have provided a summary below. =/span> Within this plan we would order the required equ=pment (2 links + 1 spare set) and licensing (3 links) to expedite the deli=ery of service. If we were to try and break this into PLAN A and PLAN B it could =elay things by a whole order of magnitude and increase your cost by more t=an the extra FCC license cost we are putting in day 1 ($4k investment to s=reamline the project). By taking this approach we can speed up the deployment timeline and cover all our ba=es so that when we come out to do the install we have the solution in plac=. 1. Primary Link Design 4>=A0 Sandia Crest to Main Residence =C2* 4P=A0 =C2* i. 11 GHz with 4' antennas <=pan style="font-style:normal;font-variant:normal;font- weight:normal;font=size:7pt;line-height:normal;font-familyfTimes New Roman'"> =C240 *=A0 =C2. NOTE: If this "Primary S=lution" is successful you would have 1 extra set of spare equipmen= (2 total), as the second link from ZDC Main to Main Residence would not be used.</=> 2. Secondary Link Design a. Sandia Crest to ZDC 40=ACI =C2* 40=A0 i. 11 GHz with 4' antennas b=4)=A0 ZDC Tower to Main Residence 40=A0 =C2* 4=A0 i. 11 GHz with 2' antennas <=pan style="font-style:normal;font-variant:normal;font- weight:normal;font=size:7pt;line-height:normal;font-family:limes New Roman"5 =C2* l>=A0 =C2* ii. NOTE: if we were to go with seco=dary solution based upon the primary solution not working from a line of site perspective, you would have 1 set of spare equipment. Quote Assumptions: 1. =C24, Travel costs — all travel costs (Flights, car rentals, hote=) to be billed back to customer at cost +15%</=> 2. Shipping costs — all shipping costs to be billed back to cu=tomer at cost +15% 4 EFTA_R1_01570514 EFTA02463498 3. =C2* Permitting — the end user will handle any necessary permits=(if required) 4. *=A0 Consumables — the attached quote is an estimate and will be=verified based upon site survey <=pan>5.Site Readiness — FT assumes that the sites have tower space= cabinet space for power supplies, power available and switch/router in pl=ce to take receipt of service Sequence of Eve=ts: 1. Week of 4/25/16 a. FT provide quote to Zorro Ranch (4/25/16) b. 4>=A0 Zorro Ranch review quote and approve (1-2 days) c. 4>=A0 Future Tech to start the FCC licensing process=/span> =C2* *=A0 =C2* i. Upon written approval of quote=/u> =C2* 40=A0 =C2* ii. Process will take 1 week to get =nitial channels assigned =C2* *40 iii. Entire licensing process will t=ke 4.5 weeks d. Zorro Ranch issue PO and provide payment (1-2 days)4=pan> 2. Week of 5/2/16 a. FCC provide conditional channel approval =C240. 40=A0 =C240 i. Remaining period of time is just =aperwork process to finalize license b. Future Tech order equipment based off of conditional channel approv=l to get order in process =C2* 40:=A0 =C2* i. 4.6 week lead time after receipt =f order 3. =C2* Week of 5/9 or 5/16 a. Future Tech to conduct Field Site Survey 4. Week of 5/23 a. Future Tech to complete field report b. 4>=A0 Future Tech to order consumable materials based upon field report EFTA_R1_01570515 EFTA02463499 5. =C240 Week of 6/16 (Estimated based upon the above chain of events=and equipment lead time) a. Deploy to market to install solution Plea=e note the above is a HIGH LEVEL timeline to help provide an outline for t=e path forward. From: Richard Kahn Sent: Friday, April 2 To: Chris Cappiel= Cc: Brice Gordon P, al=ng re " Subject: Re: Zorro=Ranch / CenturyLink Quote ok i would rush a= much as possible as our principal is very anxious to move this project thank you Richard Kahn HBRK Associates Inc. tel fax =C2. =/div> 6 EFTA_R1_01570516 EFTA02463500 On Apr 22, 2016, at 1:49 PM= Chris Cappiello <mailto > > wrote: <=div> Hey Richard, I =poke to Brice yesterday to let him know it would probably be the middle of=next week before we get a proposal over. We are running a couple designs w=th different products to get to 1 GB with the availabilities we are looking for. If you=need it sooner let me know and I will apply some internal pressure.=u> Best regards,</=> =C24, Chris Cappiello Director of Business Development =/u> Future =echnologies Venture, LLC <tela <mailto: E <image001.png> From= =ichard Kahn I=ailtc <=a> <mailto COM> Sent: Friday, April 22, 2016 1:09 PM To: Chris Cappiel=o <mailto:ccappiello@futuretechlIc.com» Cc: Brice Gordon Ma <mailto Subject: Re: Zorro=Ranch / CenturyLink Quote 7 EFTA_R1_01570517 EFTA02463501 any update on pro=osal? please advise=/u> thank you =div> Richard Kahn HBRK Associates Inc. tel fa cell < = > =/div> On Apr 18, 2016, at 8:29 AM= Chris Cappiello <mailto > wrote: <=div> Working on updating the design now. <= class="MsoNormal">Best regards,=/u> <=span> From: Brice Gordon (mailto Sent: Sunday, April 17, 2016 7:42 PM To: Chris Cappiel=o <mailto > 8 EFTA_R1_01570518 EFTA02463502 <mailto: House=u> <mailto Cc: Hector Cintron = Richard Kahn >; ZDC Subject= Re: Zorro Ranch / CenturyLink Quote Chr=s c=p> attached photo's for your referenc= Ir/u> Coordinates where taken this morn=ng from each location l=do have some concern regarding direct link from Sandia Crest to Main Any other information y=u may require please let me know regards=Brice au> Main House Towerau> 35-16-42" N 105-58'- 13" W Elevation 6726 ft =C2* 35-14'-13&quo=; N 105-58'-46"= W Elevation 6590 ft=/u> 9 EFTA_R1_01570519 EFTA02463503 </=iv> Sandia Crest Tower =idly> 35-12'-60" 106-27-7" Elevation 10620 ft On Fri, Apr=15, 2016 at 5:25 PM, Zorro Ranch <mailto > wrote: Chris I will confirm all coordinates this weekend when back on sit= I will also send=photo if MH location Thank you and have a great Weekend Thank you Regards Brice 40=A0 Sent from my iPhone=u> On Apr 15, 2016, at 3:28 PM, Chris Cappiello <mailto > >= wrote: Brice, Please see the comments below and report back. I=E240.II put a quote together based on your response about the Sandia Cr=st coordinates and if you would rather have one link direct to the main residence rather than going through ZDC.=/u> 10 EFTA_R1_01570520 EFTA02463504 =p class="MsoNormal"> =C24> I think Coordin=tes for Sa=dia Creat tower are not accurate, please see below screenshot. I have assu=ed a tower out of multiple towers on the peak — GE file attached, =lease verify coordinates. <=pan style="font-family:Arial,sans-serif;color:rgb(68,84,106)"> Ran at 11 GHz in 40 Mhz channel with HAA= Sandia Creat tower - ZDC Main tower: 26.8 mile</=> 99.997% at 227 Mbps and 99.992% at 297 Mbps with 3ft-3f= dishes <=p> ZDC Main tower - Main Residence: 2.17 mile 99=999% at 297 Mbps with 2ft-2ft dishes. Best regards, =/P> </a Chris Cap=iello Director of Business Development Future Technologies Ventu=e, LLC P: mai ltc l <mailt mailto o E: From: Zorro Ranch I <mailto Sent: Friday, April 15 2016 3:17 PM To: Chris Cappiel=o tina >; Hector Cintron mailto Cc mailto >; ZDC Subject= Fwd: Zorro Ranch / CenturyLink Quote target=> 11 EFTA_R1_01570521 EFTA02463505 To =11 Attached from =entury link for your review and comment =p class="MsoNormal">Thank you Regards Brice Sent from my iPhone Begin forwarded message: • &q=ot;Armstrong, Annette" <mailto <=>Date: April 15, 2016 at 1:51:45 PM EST To: "'Zorro=Ranch'" > Subject: Zorro Ranch / CenturyLi=k Quote Good Mo=ning Brice, Attached you will find pricing for the Wav= Fiber Circuit to be located on Sandia Crest. c=p> Charges are waived 100% $0.00 same for 100M or 200M circuit. for review upon your approval. Monthly Recurring 200M $4,500.00 3yr Term and Non-Recurrin= Construction I did request pricing for 100M Circuit on = 3yr term, and the port price was the Let us know if you have any questions or c=ncerns. I can have the contract ready Annette Armstro=g Sr. Account Executive CenturyLink Business Technology Solut=ons Office: I E-mail:= <mailto: =u> <image004.jpg> 12 EFTA_R1_01570522 EFTA02463506 This communication is the property=of CenturyLink and may contain confidential or privileged information. Una=thorized use of this communication is strictly prohibited and may be unlaw=ul. If you have received this communication in error, please immediately notify the s=nder by reply e-mail and destroy all copies of the communication and any a=tachments. <Link details_2016.04.15.pdf> <Zorro Ranch.kml> <=> =p class="MsoNormal">-- </=iv> =/P> </=iv> please note confidential, may be=attorney-client privileged, may constitute inside information, and is i=tended only for the use of the addressee. It is the property of JEE<=r>Unauthorized use, disclosure or copying of this communication or any =art thereof is strictly prohibited and may be unlawful. If you have rec=ived this communication in error, please notify us immediately by 13 EFTA_R1_01570523 EFTA02463507 re=urn e-mail or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com> , and destroy this communication an= all copies thereof, including all attachments. copyright -all rights r=served 14 EFTA_R1_01570524 EFTA02463508

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02463495.pdf
File Size 681.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 13,775 characters
Indexed 2026-02-12T17:40:39.200750
Ask the Files