Back to Results

EFTA02462979.pdf

Source: DOJ_DS11  •  Size: 151.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: jeffrey E. <jeevacation@gmail.com> Sent: Saturday, April 30, 2016 3:30 PM To: Richard Kahn Subject: Re: Great St James as i told you i have a bid for 40k. my instructions =re to source locally if i can. and save travel costs. l=will increase my offer to you . and for 50k . ok your work. =AO amy dempsey is being retained for routing. On Sat, Apr 30, 2016 at 11:23 AM, R=chard Kahn target=> > wrote: Sent from my iPhone=/div> Begin forwarded message: From: Hugo Hodge Date: April 30= 2016 at 10:27:08 AM EDT To: Richard Kahn James Good morning Mr.Kahn, »<=r>Subject: Re: Great St I have thoroughly reviewed your suggestions for modifi=ations to the bid and given your request great consideration. I honestly b=lieve that the items you requested are important for a successful project.=For example, the witnessing of the factory acceptance is not a step I woul= recommend omitting. With that said, the items y=u suggested to remove total $23,000. To ensure the integrity of this proje=t I am willing to do the project with the entire scope at the original pri=e less $23,000 for a total of $80,000. If you decline this option and are =onvinced that these items should be omitted, I am willing to reduce the re=aining items by 10% resulting in a cost of $72,000 for the revised scope. =/div> I strongly recommend you consider the first optio= but I am willing to discuss this further with you if necessary. Best Regards, Hugo Hodge Jr <=div> On Thu, Apr =8, 2016 at 12:32 PM, Richard Kahn <richardkahn12@gmail.com <mailto:=ichardkahnl2@gmail.com> ><=span> wrote: EFTA_R1_01569801 EFTA02462979 it was a pleasure speaking with you earlier. as discussed th= following areas are scopes that will not be needed and my comments: <=t> a) conceptual design on cable routes - ok to keep - p=ease revisit pricing b) detailed cable specs and preparation=of bid docs - ok to keep - please revisit pricing c)=detailed switch and meter design and prep of all switches and metering dev=ce - ok to keep - please revisit pricing d) review a=l switch and cable bid submittals and submit to Wapa for approval - <=>ok to keep - please revisit pricing e) witness factory acce=tance test - not necessary as all we need is for you to review test fro= manufacturer and should be included in d) above f) complete=final design to include civil and electrical drawings - ok to keep=- please revisit pricing g) witness installation and test el=ctrical devices - not needed h) complete as builts - =AOnot needed i appreciate your effor= in revisiting your pricing and look forward to hearing back from you this=afternoon thank you =div> Richard Kahn HBRK Associates Inc. =C2 please note The information contained in this co=munication is confidential, may be attorney-client privileged, may c=nstitute inside information, and is intended only for the use of the ad=ressee. It is the property of JEE Unauthorized use, disclosure or co=ying of this communication or any part thereof is strictly prohibitedand may be unlawful. If you have received this communication in error,=please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com</=>, and destroy this communication and all copies thereof, including =11 attachments. copyright -all rights reserved 2 EFTA_R1_01569802 EFTA02462980

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02462979.pdf
File Size 151.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,345 characters
Indexed 2026-02-12T17:42:02.888582
Ask the Files