EFTA02462979.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Saturday, April 30, 2016 3:30 PM
To:
Richard Kahn
Subject:
Re: Great St James
as i told you i have a bid for 40k. my instructions =re to source locally if i can. and save travel costs.
l=will increase my
offer to you . and for 50k . ok your work. =AO amy dempsey is being retained for routing.
On Sat, Apr 30, 2016 at 11:23 AM, R=chard Kahn
target=> > wrote:
Sent from my iPhone=/div>
Begin forwarded message:
From: Hugo Hodge
Date: April 30= 2016 at 10:27:08 AM EDT
To: Richard Kahn
James
Good morning Mr.Kahn,
»<=r>Subject: Re: Great St
I have thoroughly reviewed your suggestions for modifi=ations to the bid and given your request great consideration. I
honestly b=lieve that the items you requested are important for a successful project.=For example, the witnessing of the
factory acceptance is not a step I woul= recommend omitting.
With that said, the items y=u suggested to remove total $23,000. To ensure the integrity of this proje=t I am willing to do
the project with the entire scope at the original pri=e less $23,000 for a total of $80,000. If you decline this option and
are =onvinced that these items should be omitted, I am willing to reduce the re=aining items by 10% resulting in a cost
of $72,000 for the revised scope. =/div>
I strongly recommend you consider the first optio= but I am willing to discuss this further with you if necessary.
Best Regards,
Hugo Hodge Jr
<=div>
On Thu, Apr =8, 2016 at 12:32 PM, Richard Kahn <richardkahn12@gmail.com <mailto:=ichardkahnl2@gmail.com>
><=span> wrote:
EFTA_R1_01569801
EFTA02462979
it was a pleasure speaking with you earlier. as discussed th= following areas are scopes that will not be needed
and my comments:
<=t>
a) conceptual design on cable routes - ok to keep - p=ease revisit pricing
b) detailed cable specs and preparation=of bid docs - ok to keep - please revisit pricing
c)=detailed switch and meter design and prep of all switches and metering dev=ce - ok to keep - please revisit
pricing
d) review a=l switch and cable bid submittals and submit to Wapa for approval - <=>ok to keep - please revisit
pricing
e) witness factory acce=tance test - not necessary as all we need is for you to review test fro= manufacturer and
should be included in d) above
f) complete=final design to include civil and electrical drawings - ok to keep=- please revisit pricing
g) witness installation and test el=ctrical devices - not needed
h) complete as builts - =AOnot needed
i appreciate your effor= in revisiting your pricing and look forward to hearing back from you this=afternoon
thank you
=div>
Richard Kahn
HBRK Associates Inc.
=C2 please note
The information contained in this co=munication is confidential, may be attorney-client privileged, may c=nstitute inside
information, and is intended only for the use of the ad=ressee. It is the property of JEE Unauthorized use, disclosure or
co=ying of this communication or any part thereof is strictly prohibitedand may be unlawful. If you have received this
communication in error,=please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com</=>, and
destroy this communication and all copies thereof, including =11 attachments. copyright -all rights reserved
2
EFTA_R1_01569802
EFTA02462980
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02462979.pdf |
| File Size | 151.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,345 characters |
| Indexed | 2026-02-12T17:42:02.888582 |