Back to Results

EFTA02462659.pdf

Source: DOJ_DS11  •  Size: 174.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: jeffrey E. <jeevacation@gmail.com> Sent: Monday, April 23, 2018 12:55 AM To: brice gordon Subject: Re: Chris: Cristobal & 2 Laborers he doesnt know much but he knows trees. =nd works hard. I realize the problem lets try to m=ke the best of it. . / On Sun, Apr 22, 2018 at 8:45 PM, brice gordon > wrote: We will support him, I truly believe that Dupson and hi= team can do this, but if Chris is going to have oversite, this will be ve=y disruptive We will try and make this work, but Chris needs to =et "his act" together and work with the team on the ground=/div> Regards Brice Sent from my iPhone On Apr 22, 2018,=at 8:35 PM, jeffrey E. <jeevacation@gmail.com <mailto:jeevacation@gmail.com> wrote: i agree i assumed this would =ave already been worked out. sorry, that being saidk.=A0 chris is only there for a limited period and is for the moment th= only one who really knows how to do these things. he should b= given all the help he needsl there is little landscapin= that is more important. I should have made sure a=l was settled before he started, but. .. . =C2* the trees need oversight. im not sure what dupson knows =t all. brice i d appreictiate it if you would go e=sy on chris as he is doing me a favor by being thre after he q=it. thx. ps you and =aren are doing a great jon in a very difficult circumstance without =uch help. it is sincerly appreciated. On Sun, Apr 22, 2018 at 8:30 PM= brice gordon <rnailto:ta > wrote: Good Evening Anna It would be more efficient that Chris works with the team on t=e ground to get this completed Chris needs to be on the Boat to LSJ at 7am, once on site we will re=iew project as you are aware there are many pressing projects which need t= be worked out to insure everything is completed in a timely manner Chris needs to work with the team and the limited equipment on site =hich we will discuss once he arrives BG EFTA_R1_01569272 EFTA02462659 Sent from my iPhone > On Apr 22, 2018, at 5:12 PM, Ann Rodriquez » wrote:<=r» > Hi Brice, > Chris schedule as of today. (Change in schedule is possible) > 7am Monday 23rd: > Chris to LSJ/GSJ to check water, irrigation supplies, Landscaping supp=ies and pictures to send to Bossman > *Needed: Cristobal & 2 helpers > 7am Tuesday 24th: > Chris will begin digging for the Transplanting of the Turpentine Trees=from GS1 to LSI > *Needed: 2 Helpers and 1 Trackhoe/Backhoe w/operators > 7am Wed 25th, Thu 26th & 27th: > Transplanting from GSJ to LSJ > *Needed: 2 Helpers, 1 Lull (Chris), 1 Trackhoe/Backhoe w/operator > Note: > LS1 Management will issue the Manpower and machines needed with an ope=ator as done previously for all outside or in-house contractors. I should =ave more info from Chris tomorrow during or after his LSJ visit on what•=804$ needed for him to complete all plant projects requested > Ann R. » On Apr 22, 2018, at 3:55 PM, brice gordon > wrote:=br> » » Hi Anna » Can Chris please forward a schedule for work » Have issue with Cristobal, as he and his helper are already slamme= with irrigation repairs repairs on both LS1 and GSJ » Helpers, we maybe able to help out with » Also what equipment will he need and who will be operating it ?? <=r> » » Regards Brice » Sent from my iPhone >» On Apr 22, 2018, at 1:29 PM, Ann Rodriquez rote: >» >» Hi all, 2 EFTA_R1_01569273 EFTA02462660 >>> >>> Chris is requesting Cristobal and 2 laborers until his project= are completed? >>> >>> Please advise, >>> Ann R. conversation-id 8837 date-last-viewed 0 date-received 1524444901 flags 8590195713 gmail-label-ids 7 6 remote-id 815145 3 EFTA_R1_01569274 EFTA02462661

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02462659.pdf
File Size 174.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,663 characters
Indexed 2026-02-12T17:42:45.158963
Ask the Files