EFTA02474853.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Thursday, January 21, 2016 9:24 PM
To:
Richard Kahn
Subject:
Re: Asphalt
asphalt should be MUCH cheaper now. it is made with =il get asphalt prices puerto rico vs jeffers now and then <=div>
On Thu, Jan =1, 2016 at 4:00 PM, Richard Kahn
></=pan> wrote:
Anna and I spoke with Jeffers and wanted to review our findings:
Original Bid 512,500
3 =9D aggregate base =0,712
Less: savings • =/span>(9,000)
Less: diesel fuel savings "• (3,600)
Revised T=tal Cost 590,612 •*.=
Attached is Swale bid of 42,062 f=r 32 swales which was not included above. I do not recall if you wan=ed to do
a smaller number of swales or pass for now.
<=iv>
• estimated savings by sourcing cheaper trucks (250 or 3=0 vs 400 per jeffers) & using our heavy materials
account for crushed =tone (29.50 vs 30.00)
jeffers fee (no 15% fee on st=ne or portion of trucks we source)
-> Note that we may have additional costs for crusher ru= as Anna has stated some of crusher stone has washed
away and 3" d=es not remain in all locations were it was laid
-> it appears that we have already laid ap=roximately 800 of 1300 tons
• • jeffers exp=ained that he uses 1.5 gallons of diesel fuel for each ton of asphalt pavi=g
->1500 tons x =.5 gallons of diesel = 2,250 diesel gallons x 1.60 per gallon savings =3D 3,600
••• Note this figure does not include ba=ge costs (we still have approximately 20,000 credit with boyson)
Jeffers figures he needs 4-5 days to complet= crusher run and then 3-4 weeks for Asphalt
He can begin Februar= 1st and complete no later than March 4th provided work is not halted for =eather or no
work days per your requests
Please a=vise
Thank you
EFTA_R1_01587716
EFTA02474853
On Aug 7, 2015, at 6:41 PM, Eason =effers
wrote:
<=div>
=ood Day Daphne,
Please see attached proposal for added aggregate base for LS.1 paving= Sorry for the
delay.
Kindest Regards,
=/u>
Eason Jeffers
=span style="font-size:9pt;font-family:'Perpetua Titling MT',seri=">USVI General
Manager
=span style="font-size:12pt;font-family:'Times New
Roman',serif">=lt;Betteroads Proposal_ Added Aggregate Base.pdf><=div>
Forwarded
From: "Eason Jeffers'
Date: Aug 5= 2015 8:44 AM
Subject: Betteroads Proposal_Road Drainage Measures
To= "Daphne Wallace'
Cc: "ann rodriquez& uo=
, "Rich Kahn"
Good Day Daphne,
<= class="MsoNormal">
Please see attached the proposal for the drainage controls=as shown on the roadway
plans. Those plans also show a 3 inch aggregate ro=d base that was not a part of the original proposed scope. Do you
want me =o review the base and give you some numbers for the scope?</=pan>
2
EFTA_R1_01587717
EFTA02474854
Kindest Regards,
USVI General Manager
=/div>
<=iv>Richard Kahn
HBRK Associates Inc.
please note
The information contained in this communication is
confidential, =ay be attorney-client privileged, may
constitute inside information, an= is intended only for
the use of the addressee. It is the property of.IEE
Unauthorized use, disclosure or copying of this
communication o= any part thereof is strictly prohibited
and may be unlawful. If you ha=e received this
communication in error, please notify us immediately by=br>return e-mail or by
e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com> , and
destroy this communicat=on and all copies thereof,
including all attachments. copyright -all ri=hts reserved
3
EFTA_R1_01587718
EFTA02474855
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA02474853.pdf |
| File Size | 168.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,467 characters |
| Indexed | 2026-02-12T17:52:06.647027 |