From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Wednesday, February 24, 2016 9:31 AM
To:
Richard Kahn
Subject:
Re: El Brillo Way Sea Wall Bids
lets talk on mon. how long does the repair take?4>=A0 we should do it when the windows are getting installed.
On Wed, Feb 24, 2016 at=12:22 AM, Richard Kahn <
wrot=:
Arra
at=ached are both bids:
original from Dan 29,800 and new bid fro= Brian 64,915
below Brian explains the difference= between both bids
please advise
thank =ou
Richard Kahn
HBRK Associates Inc.
New York, NY 10022
Begin forwarded message:
<=iv style="margin-top:0px:margin-right:0px:margin-bottom:0px:margin-left:=px">From: Brian
<mailto
> >
Subject: El Brillo Way Sea Wall Bids<=r>
Date: February 23, 2016 at 4:47:07 PM EST
To: Richard Kahn
<=a»
> >
Rich,
I looked at both bids closely. I =id a quick sketch to help (I hope) visualize whats going on with the sea
w=lI and what both Contractors are proposing.
EFTA_R1_01583085
EFTA02471505
The First part of both bids=are relatively the same. Remove old sheet piling, pound new sheet piling i=to
the lake floor a few inches out from the old concrete and pour new conc=ete. This is meant to help hold back the base of
existing sea wall.
Thi= step will help hold and buy some time, and I would say that both contract=rs would be in the
$30,000.00 range to complete this job.
Step 2 .=This is where Pilings Plus would drill 29 manta rays approximately every 5=foot along the sea
wall on an angle down to further reinforce =he sea wall. I've enclosed a youtube video link, so you can
understand=what a manta ray is and does.
Step 3. Drill 18 weep holes approximately=every 8 foot along the sea wall with well points to allow
water to drain o=t but not the soil.
=C2* As the tide rises the water from the lake actually flows =ehind the sea wall and the water in
the ground will rise with the tides. W=en the tide goes out the water is trapped behind the sea wall causing hydr=static
pressure trying to get out. The weep holes allow it to go out reduc=ng hydrostatic pressure.
Conclusion: Labontes bid or just ins=alling the new sheet piling and concrete is a one step approach for
repair=
Q=AO
Pilings Plus=has a multi or 3 step approach for repair that addresses 3 separate issues=
and of course is more costly but likely a more permanent repair.
I hop= this helps
Thanks,
Brian
https://youtu.be/Rtq-YFgUQ60 <https://youtu.be/Rtq-YFg=Q60>
From: David Newm=rk <pil=ngsplusdavid@yahoo.com
<mailto
Date: February 23, 2016 at 9=57:35 AM EST
To: '
<mailtc
> " <David:
954.520.5770 <tel:954.520.5770>
Fax: 561.241.5367 <tel:561.241.5367>
E-mai=:
<mailto
Website: www.floridapilings.co=
<=div>
2
EFTA_R1_01583086
EFTA02471506
please note
The info=mation contained in this communication is
confidential, may be attorney=client privileged, may
constitute inside information, and is intended o=ly for
the use of the addressee. It is the property of
JEE
Unauth=rized use, disclosure or copying of this
communication or any part ther=of is strictly prohibited
and may be unlawful. If you have received thi=
communication in error, please notify us immediately by
return e-ma=l or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com> , and
destroy this communication and all cop=es thereof,
including all attachments. copyright -all rights reserved
3
EFTA_R1_01583087
EFTA02471507
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Email Addresses
Phone Numbers
Document Details
| Filename | EFTA02471505.pdf |
| File Size | 162.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,421 characters |
| Indexed | 2026-02-12T17:52:55.474015 |