Back to Results

EFTA02475030.pdf

Source: DOJ_DS11  •  email/external  •  Size: 71.5 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: jeffrey E. <jeevacation@gmail.com> Sent: Thursday, April 12, 2018 7:59 PM To: Amy Dempsey Subject: Re: ACE - Cables and Non-compliance we pulled out the barge ramp across month ago. =we can pull out xmas cove , i would like to do so if that is t=e hold up. i thought we would asking for the deliniation weeks=ago On =hu, Apr 12, 2018 at 3:55 PM, Amy Dempsey wrote: Army Corp= called late this morning and said that enforcement has decided to hold up=the VIWAPA cable project because of the LSJ non-compliance issues. A=my Corps suggested that we removed the LSJ-GSJ cable so the ca=le system can move ahead. I ended up talking with Jonathon Pempek as well as Sindulfo Cast=llo and they said although it is unusual to hold up a project that the app=icant was not the violator on they felt this was good leverage. So Jonathon said get the barge ramp= out and pull the fill material back out around the wetland near the point=closest to LSJ. I am waiting on old wetland delineation from Ryan Wi=ehart so I can mark it and we can get the material moved back a couple of =eet and plant a few mangroves. Jonathon suggest that if you really want one of the barge ram=s we could pull it out and then ask for a permit for it. He stressed that he wants you to get all=the things you want but we have to go through the permit process. conversation-id 9696 date-last-viewed 0 date-received 1523563129 flags 8590195713 gmail-label-ids 7 6 remote-id 812065 1 EFTA_R1_01587964 EFTA02475030

Document Preview

Document Details

Filename EFTA02475030.pdf
File Size 71.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,507 characters
Indexed 2026-02-12T17:53:19.913662

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files