Back to Results

EFTA02478541.pdf

Source: DOJ_DS11  •  Size: 58.8 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Ann Rodriquez < Sent: Monday, December 14, 2015 2:30 PM To: Jeffrey E. Subject: Fwd: Cost of crusher run surface course_LSJ Ann R. Begin forwarded m=ssage: From: Eason Jeffers < <mailto >> =ate: December 14, 2015 at 7:52:56 AM AST <mailto »Cc: Rich Kahn To: ann rodriquez &l= <mailto > >, Daphne Wallace < <mailto:dlbwallace@g=ail.com» Subject: Cost of crusher=run surface course_LSJ Good Day Ana, Please see below costs for placing crusher run as a srrface course. The costs are based on 5 inches of crusher material which wil= allow for erosion and give you a longer duration of use before replacement=is needed; Crusher Run Material - =nbsp; &nbs=; &n=sp; =nbsp; $106,950.00 Transportation (Trucking) - &=bsp; &nb=p; $=67,555.00 Grading and placing Costs &nbs=; &n=sp; =nbsp; &nbs=; $148,120.00 Labor =nbsp; &nbs=; &n=sp; =nbsp; &nbs=; &n=sp; =nbsp; $78,920.00 Total Costs = &nb=p; &=bsp; = $501,545.00 Kindest Regards, EFTA_R1_01593160 EFTA02478541 Eason Jeffers USVI General Manager Betteroads Asphalt Corporation 2 EFTA_R1_01593161 EFTA02478542

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02478541.pdf
File Size 58.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,112 characters
Indexed 2026-02-12T18:02:38.664384
Ask the Files