EFTA02484503.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Wednesday, October 14, 2015 5:30 PM
To:
Ann Rodriquez
Subject:
Re: Pebble Beach
2 but straight across a line from the road to rocks.=C240 extend 2 out and make it straight following the left side of the
roa=
On Wed= Oct 14, 2015 at 12:30 PM, Ann Rodriquez <
=gt; wrote:
Sylvester is framing u= for the Concrete Pour at Pebble Beach.
He asked how far out would you like it...
1 - 18yrds (2 Trucks)
2 - 27yrds (3 Trucks)
Ann R.
conversation-id 101247 date-last-viewed 0 date-received 1444843827 flags 8590195713 gmail•label-ids 7 6 remote-id
552546
EFTA_R1_01602466
EFTA02484503
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Phone Numbers
Document Details
| Filename | EFTA02484503.pdf |
| File Size | 35.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 643 characters |
| Indexed | 2026-02-12T18:03:03.939140 |