EFTA02490723.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Larry Visoski <
I
Sent:
Friday, August 21, 2015 2:12 PM
To:
Je vacation
Subject:
Rolls Royce
Jeffrey
I'm working schedule with Dallas Airmotive and Rolls Royce., Kathleen advises engines are completing post inspection
and could be deliver=d to Dallas by Friday August 28th,.
Depending on your flight schedule and Dallas AirMotive, we could start loane= engine install Monday August 31st., and
probably test fly Thursday Sept 3r= estimate.
Does this work for you?
If loaners remedy our issue, we leave them installed and GIV is back in serv=ce Thursday or Friday Sept 4th, while our
engines complete midlife inspecti=n.
8727
-Larry Morrison is planning to accomplish A2 inspection on Boeing when it ar=ives in Palm Bch Saturday, it's not due
until Sept 9th, it's light inspecti=n 4 day down time we will accomplish on P8I ramp.
Does this plan work for you ?
Thx
Larry
Sent from my iPhone=?xml version=.0" encoding=TF-8"?> <IDOCIYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN"
"http://www.apple.com/DTDs/Propertylist-1.0.dtd">
<plist version=.0">
<dict>
<key>conversation-id</key>
<integer>106881</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1440166306</integer>
<key>flags</key>
<integer>8590195717</integer>
<key>gmail-label-ids</key>
<array>
<integer>2</integer>
</array>
<key>remote-id</key>
<string>535979</string>
</dict>
Violist>
EFTA_R1_01611912
EFTA02490723
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02490723.pdf |
| File Size | 71.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,460 characters |
| Indexed | 2026-02-12T18:15:11.041007 |