EFTA02486670.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Lesley Groff MIIMI
>
Sent:
Thursday, September 24, 2015 2:59 PM
To:
Jeffrey Epstein
Subject:
Proposed Lesley/Bebe Schedule Fri. Sept. 25th
Proposed Lesley/Bebe Schedule for tomorrow ?
12:40pm Arrive STT
Pick up by Jermaine or Lucas and go to STC to meet everyone.
Meet Larry at the airplane for a tour then head to island via heli or =oat (? which one)
Tour island, meet everyone
Boat or heli back to STT and check in to the Ritz
Have dinner at Ritz then lights out...
Daphne says we should leave the Ritz Sat. at 6:15am to be at the airport =y 6:45am for the 8:05am flight.
<?xml version=.0" encoding=TF-8"?>
<!DOCTYPE plist PUBLIC "-//Apple//DID PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd">
<plist version=.0">
<dict>
<key>conversation-id</key>
<integer>103456</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1443106752</integer>
<key>flags</key>
<integer>8590195717</integer>
<key>gmail-label-ids</key>
<array>
<integer>6</integer>
<integer>2</integer>
</array>
<key>remote-id</key>
<string>545995</string>
</dict>
</plist>
EFTA_R1_01605744
EFTA02486670
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Phone Numbers
Document Details
| Filename | EFTA02486670.pdf |
| File Size | 58.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,165 characters |
| Indexed | 2026-02-12T18:15:14.260532 |