Back to Results

HOUSE_OVERSIGHT_018777.jpg

Source: HOUSE_OVERSIGHT  •  Size: 0.0 KB  •  OCR Confidence: 85.0%
View Original Image

Extracted Text (OCR)

All Net Resort Arena — is being built at a cost of approximately $1.4 billion and is set to open in early 2018 on the north end of the Las Vegas Strip. In addition to a spectacular 860,000-square-foot arena that is able to host big ticket events, the complex includes the Victory Plaza shopping and dining district and a 44-story hotel with 500 specialty suites. The arena at the All Net Resort features a unique retractable roof. The Victory Plaza area covers 300,000 square feet and is a pedestrian-only plaza that offers something akin to the Times Square experience in New York. Mandalay Bay Convention Center (Phase 1 & 2) — A $66-million expansion on the Mandalay Bay Convention Center completed is scheduled to complete January 2016. Construction on Phase 1 completed July 2015 adding more than 350,000-square-feet of exhibit space, as well as underground parking. Phase 2 of the expansion will include 70,000-square-feet of additional ballroom space that will be divisible by five breakout areas for corporate groups. When completed, the convention center will total 2,050,000 square feet. Shops at Tropicana — A new, $100-million, 275,000-square-foot, two-story, enclosed shopping mall will feature luxe retail, a food court on the ground floor with five new boutique restaurants and two Strip-facing restaurants. The project is expected to begin in fall 2015 with an anticipated completion date in the 2017. HOUSE_OVERSIGHT_018777

Document Preview

HOUSE_OVERSIGHT_018777.jpg

Click to view full size

Document Details

Filename HOUSE_OVERSIGHT_018777.jpg
File Size 0.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,444 characters
Indexed 2026-02-04T16:36:05.959938