HOUSE_OVERSIGHT_018777.jpg
Extracted Text (OCR)
All Net Resort Arena — is being built at a cost of approximately $1.4 billion and is set to
open in early 2018 on the north end of the Las Vegas Strip. In addition to a spectacular
860,000-square-foot arena that is able to host big ticket events, the complex includes
the Victory Plaza shopping and dining district and a 44-story hotel with 500 specialty
suites. The arena at the All Net Resort features a unique retractable roof. The Victory
Plaza area covers 300,000 square feet and is a pedestrian-only plaza that offers
something akin to the Times Square experience in New York.
Mandalay Bay Convention Center (Phase 1 & 2) — A $66-million expansion on the
Mandalay Bay Convention Center completed is scheduled to complete January 2016.
Construction on Phase 1 completed July 2015 adding more than 350,000-square-feet
of exhibit space, as well as underground parking. Phase 2 of the expansion will
include 70,000-square-feet of additional ballroom space that will be divisible by five
breakout areas for corporate groups. When completed, the convention center will
total 2,050,000 square feet.
Shops at Tropicana — A new, $100-million, 275,000-square-foot, two-story, enclosed
shopping mall will feature luxe retail, a food court on the ground floor with five new
boutique restaurants and two Strip-facing restaurants. The project is expected to
begin in fall 2015 with an anticipated completion date in the 2017.
HOUSE_OVERSIGHT_018777