Back to Results

EFTA02494704.pdf

Source: DOJ_DS11  •  schedule  •  Size: 131.6 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: jeffrey E. <jeevacation@gmail.com> Sent: Tuesday, July 7, 2015 9:19 PM To: Daphne Wallace Subject: Re: LSJE Road Paving Project Schedule - July 6, 2015 yes On Mon, Jul 6, 2015 at 10:14 PM, Daphne Wallace Greeti=gs Sir, 2015. > wrote: For you= review, comments and approval is the proposed Asphalt Road Paving Project=schedule for August =span style="font-size:12pt:font-family:Arial,sans-serir> =p class="MsoNormal" style="margin-bottom:0.0001ptbackground-image:inirial;background- repeat:initial">Week 1: Sunday, August 2, 2015: Boyson =ill transport the Better Roads equipment and lighter materials to LSJ<=pan style="font-size:l2pt;font-family:Arial,sans-serif">. The rest=of the week, Monday, August 3 to Friday, August 7, will be p=eparatory work on LSJ. There will be no daily transport via Boyson. LSJ wi=l provide transportation via Little C for the Better Roads crew during thi= week. We=k 2: =A0Monda=, August 10 to Friday, August 14 (30 loads total) via Boyson <1=> 5:00 am - 3 truckloads asphalt - Red Hook (RH) to LSJ 10:00 am - 3 truckloads asphalt - RH to LSJ=/p> 2:00 pm - 6 trucks - LSJ to RH Week 3: Monda=, August 17 to Friday, August 21 (30 loads total) via Boyson<=p> 5:00 am - 3 truc=loads asphalt - RH to LSJ 10:00 am - 3 truckloads asphalt - RH to LS1 EFTA_R1_01618384 EFTA02494704 2:00=pm - 6 trucks - LSJ to RH Week 4: Monday, August 24 to =riday, August 28 (15-20 loads total) via Boyson 5:00 am - 3 truckloads asphalt - RH to LSJ 10:00 am - 3 truckloads asphalt - RH to LSJ 2:00 pm - clean up,=return equipment to STT The Better Roads crew =ill also transported via Boyson during Weeks 2, 3 and 4. Better Roads has planned a S day p=r week schedule.=C2 Better Roads =A0will =se Saturdays and Sundays for "rain days" makeup, if needed= and will be transported to and from LSJ within Boyson's schedule as n=eded. Attached for your reference is the map of the areas and phases of pavi=g. Is Sunday, A=gust 2, 2015 approved to begin the project? Respectfully, Daphne <=div> please =ote The information contained in this communication is confiden=ial, may be attorney-client privileged, may constitute inside informati=n, and is intended only for the use of the addressee. It is the propert= of JEE Unauthorized use, disclosure or copying of this communica=ion or any part thereof is strictly prohibited and may be unlawful. If =ou have received this communication in error, please notify us immediat=ly by return e-mail or by e-mail to 2 EFTA_R1_01618385 EFTA02494705 jeevacation@gmail.com <mailto:jeevacation@gmail=com> , and destroy this comm=nication and all copies thereof, including all attachments. copyright -=11 rights reserved 3 EFTA_R1_01618386 EFTA02494706

Document Preview

Document Details

Filename EFTA02494704.pdf
File Size 131.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,750 characters
Indexed 2026-02-12T18:15:38.054046

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files