EFTA02502350.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Richard Kahn
Sent:
Friday, March 16, 2018 7:04 PM
To:
Jeffrey E.
Subject:
Hardwood Flooring project update
reminder to advise brice on which door openings you would =ike enclosed for Cabannas 1, 2 & 3 this will =eed to be
done before coral stone tiles are removed which is now =entatively scheduled for April 2nd
Wood Floor project for Cabanas (4), =ym, Chillax and Master will begin April 16th and be completed by May =1st
Final =ricing for Wood Floors came to $220,000 - i will send 50% deposit today ts requested by Absolute Flooring
i was able to lower price by $9,300 and = added scope as that they will now be performing leveling of subfloors =hich
was originally omitted in scope and =robably another $7,500 in savings
additional costs for project are =hipping container - estimated -> 5,000 airfare,=food and hotels for 3-4 men for 45 days
=/span> -> 25,000
Total Projected Cost =50,000
Richard Kahn
HBRK Associates Inc
1
EFTA_R1_01630605
EFTA02502350
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02502350.pdf |
| File Size | 48.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 986 characters |
| Indexed | 2026-02-12T18:26:32.611267 |