EFTA02497146.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Wednesday, June 24, 2015 9:16 PM
To:
Richard Kahn
Subject:
Re: Dock Fenders
1.5
On Wed, Jun 24, 2015 at 4:17 PM, Richard Kahn <
• >
wrote:
ok thank you
regarding hole placement =n fenders would you like every 1.5 feet or every foot
please advise
thank you
Richard Kahn
HBRK Associates Inc.
New York, NY 10022
tel
a>
fax
cell
On Jun 24, 2015, at 2:17 PM, jeffre= E. <jeevaca=ion@gmail.com <mailto:jeevacation@gmail.com»
wrote:
option 3
</=iv>
On Wed, Jun 2=, 2015 at 1:38 PM, Richard Kahn
<mailtc
> wrote:
Richard Kahn
HBRK Associates Inc.
New York, NY 10022
tel
fax
cel
EFTA_R1_01621991
EFTA02497146
Begin forwarded message:
<=iv st le="mar in-to :0 x;margin-right:0px;margin-bottom:0px;margin-
left:=px">From: Richard Kahn <
Subject: Dock Fenders
=ate: June 23, 2015 at 3:44:00 PM EDT
<=iv style="margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:=px">To:
"Jeffrey E." 8t=t;jeevacation@g=ail.com <mailto:jeevacation@gmail.com»
Layout
<=span>
Attached are S layout options for dock fenders in addition=to our current layout
Options 1-3 are three rows =f 6' fenders
Carlos measured to cover entire dock we wou=d need 693 feet which comes to
116 (6' pieces)
77 (6=E244 pieces)
configuration
Options 4 & 5 are two rows of 6' fenders
Carlos=measured to cover entire dock we would need 462 feet which comes to
Note 500 feet is minimum order therefore we =ill need to order 84 pieces
Carlos has sample=on LSJ in dark grey color which you said was correct color
<=div>
If you are not satisfied with any of the above layouts please adv=se on alternate
<=>Fender Holes
Regarding Hol=s in Fenders i also outlined two options
Op=ion A - Screws will be 1.5 feet apart
Option B - Screws wi=I be 1 foot apart
The Back Hole would be 1/2Q=80. and Front Hole will be 1.5"
Timing
2
EFTA_R1_01621992
EFTA02497147
Product=on will take 3 weeks and then another 1 week for shipping
=rojected arrival on STT is July 20
Installation
Carlos said that with Ramon and Hernando inst=llation will take approximately 1
week
= 9,314.92
348.004=A0
piece x 1=.00) 4,176.00
50= feet = 6,720.00
</=iv>
x 12.00) 3,02=.00
per piece (3 or 4)
=div>Projected Costs
Options 1-3 (th=ee rows of fenders) Color - Dark Grey $4 11181 13.44 x 693 feet
Vendor Hole Drilling (1 drilling cost per hole x 116 pieces x 3 holes=
Stainless Ste=l Threaded Rods & Bolts (estimated 116 pieces x 3 screws per
Tropical Shipping 1,500.00
Mis=ellaneous Tools (drill bits, etc) = 661.08
Total Cost with thr=e rows of fenders
16,000.00
</=iv>
Options 4 & 5 (two rows of fenders) Color - Dark Grey # 11181=C* 13.44 x
Vendor Hole Drilling (1 drilling cost per hol= x 84 pieces x 3 holes) =C24, 252.00
Stainless Steel Threaded Rods & Bolts (estimated 84 pieces x 3=screws per piece
Tropi=al Shipping 1,5=0.00
Miscellaneous Tools (drill bits, etc) 504.00
=otal Cost with three rows of fenders
12,000.00
<=iy>
Please advise on which Option you would l=ke in addition to number of holes
=div>
http://www.zoro.com/value-brand-thr=aded-rod-plain-12-10x3-ft-
Ic01201003pIdar/i/G1605527/?utm_source=google_=hopping&utm_medium=cpc&utm_campaign=Google_Shopping_F
eed&g=lid=CjwKEAjwh6SsBRCYrKHF713NjicSJACUxAh7poTcc2K3zsySvFqwmGI2K3TUQ52UwvFj=xcOQ-
Lh5hoCFKnw_wcB&gclsrc=aw.ds <http://www.zoro.com/value-brand-threaded-rod-plain-12-=0x3-ft-
lc01201003pIdar/i/G1605527/?utm_source=google_shopping&utm_me=ium=cpc&utm_campaign=Google_Shopping_F
eed&gclid=CjwKEAjwh6Ss=RCYrKHF713NjicSJACLIxAh7poTcc2K3zsySvFqwmGl2K3TUQ52UwvFjuxcOO-
Lh5hoCFKnw_wc=&gclsrc=aw.ds>
</=iv>
3
EFTA_R1_01621993
EFTA02497148
http://technorubberindustries.com/techno.pdf
Richard Kahn
HBRK Associates Inc.
New York, NY 10022
tel
fa
cel
=/blockquote>
=/div>
<=blockquote>
=C24)
please note
The informat=on contained in this communication is
confidential, may be attorney-cli=nt privileged, may
constitute inside information, and is intended only =or
the use of the addressee. It is the property of
JEE
Unauthoriz=d use, disclosure or copying of this
communication or any part thereof =s strictly prohibited
and may be unlawful. If you have received this
return e-mail o= by e-mail to j=evacation@gmail.com
<mailto:jeevacation@gmail.com> , and
destroy this communication and all copies =hereof,
including all attachments. copyright -all rights reserved
4=iv>
4
EFTA_R1_01621994
EFTA02497149
40=4%0
please note
The information=contained in this communication is
confidential, may be attorney-client=privileged, may
constitute inside information, and is intended only for=br>the use of the addressee. It is
the property of
JEE
Unauthorized =se, disclosure or copying of this
communication or any part thereof is =trictly prohibited
and may be unlawful. If you have received this
co=munication in error, please notify us immediately by
return e-mail or b= e-mail to jeev=cation@gmail.com <mailto:jeevacation@gmail.com>
and
destroy this communication and all copies the=eof,
including all attachments. copyright -all rights reserved
5
EFTA_R1_01621995
EFTA02497150
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02497146.pdf |
| File Size | 252.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,158 characters |
| Indexed | 2026-02-12T18:27:27.989289 |