Back to Results

EFTA02507940.pdf

Source: DOJ_DS11  •  Size: 70.0 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Richard Kahn < Sent: Friday, March 13, 2015 3:42 PM To: jeffrey E. Subject: Apt 3M Renovation Estimated Cost Breakdown Kitchen =/span>15,000 Bathroom 12,500 Total Estimated =osts =/span>27,500 Please advise if anthony should proceed with Kitchen and =athroom or Kitchen only? Thank you Richard Kahn HBRK Associates Inc. 575 Lexington =venue 4th Floor New York, NY 10022 Begin forwarded =essage: Subject: Re: 3M From: A =arrett < <mailto Date: March 12, 2015 at 4:31:06 PM EDT To: Rich Kahn < The bathroom renovation will add an =dditional Plumbing : $4000 Tile :$2800 Shower door $1200 Toilet, sink and vanity =2000 Labor for all $2500 Total will be aprox $12,500 for the bathroom > > EFTA_R1_01638822 EFTA02507940 On Mar =2, 2015, at 4:17 PM, Richard Kahn < > wrote: can you please quantify costs so i can present to jee? thanks Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th =loor New York, NY 10022 On Mar 12, 2015, at 3:45 =M, A Barrett < <mailto > wrote: Just heard from penn that the occupant is requesting a =omplete bathroom renovation. This will substanitally increase the =ost. Anthony Barrett Ossa Properties, =nc. 301 East 66th St NY NY 10065 Anthony Barrett Ossa Properties, Inc. 301 East 66th St NY NY 10065 2 EFTA_R1_01638823 EFTA02507941

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02507940.pdf
File Size 70.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,328 characters
Indexed 2026-02-12T18:36:52.788257
Ask the Files