EFTA02507940.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Richard Kahn <
Sent:
Friday, March 13, 2015 3:42 PM
To:
jeffrey E.
Subject:
Apt 3M Renovation
Estimated Cost Breakdown
Kitchen =/span>15,000
Bathroom 12,500
Total Estimated =osts =/span>27,500
Please advise if anthony should proceed with Kitchen and =athroom or Kitchen only?
Thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington =venue 4th Floor
New York, NY 10022
Begin forwarded =essage:
Subject: Re: 3M
From: A =arrett <
<mailto
Date: March 12, 2015 at 4:31:06 PM EDT
To: Rich Kahn <
The bathroom renovation will add an =dditional
Plumbing : $4000
Tile :$2800
Shower door $1200
Toilet, sink and vanity =2000
Labor for all $2500
Total will be aprox $12,500 for the bathroom
> >
EFTA_R1_01638822
EFTA02507940
On Mar =2, 2015, at 4:17 PM, Richard Kahn <
> wrote:
can you please quantify costs so i can present to jee?
thanks
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th =loor
New York, NY 10022
On Mar 12, 2015, at 3:45 =M, A Barrett <
<mailto
> wrote:
Just heard from penn that the occupant is requesting a =omplete bathroom renovation.
This will substanitally increase the =ost.
Anthony Barrett
Ossa Properties, =nc.
301 East 66th St
NY NY 10065
Anthony Barrett
Ossa Properties, Inc.
301 East 66th St
NY NY 10065
2
EFTA_R1_01638823
EFTA02507941
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02507940.pdf |
| File Size | 70.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,328 characters |
| Indexed | 2026-02-12T18:36:52.788257 |