Back to Results

EFTA02509922.pdf

Source: DOJ_DS11  •  Size: 41.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: jeffrey E. <jeevacation@gmail.com> Sent: Sunday, March 11, 2018 10:20 PM To: LSJ GSJ; BMG; Richard Kahn Subject: Re: LSJ_GSJ_PROJECT_REPORT_031118 we need a time line. for ex = replacing all the bad treess in the master compound 40=A0 april 1-15. then stone work entire compoind 4 1= - 5 15. ? floors aprill - may 5. Q=A0 etc. a full contstrcution time line. Id also li=e to see price s for ex . flooring etc. On Sun, Mar 11, 2018 at=10:36 PM, LSJ GSJ <theethatieseetreetp@rneibeerer » wrote: Good EveningAttached Project Report for L.S1 & GSJ Warmest regards4,=A0 Karen conversation-id 13026 date-last-viewed 0 date-received 1520806811 flags 8590195713 gmail-label-ids 7 remote- id 803657 1 EFTA_R1_01641458 EFTA02509922

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02509922.pdf
File Size 41.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 749 characters
Indexed 2026-02-12T18:38:44.208292
Ask the Files