EFTA02509922.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
jeffrey E. <jeevacation@gmail.com>
Sent:
Sunday, March 11, 2018 10:20 PM
To:
LSJ GSJ; BMG; Richard Kahn
Subject:
Re: LSJ_GSJ_PROJECT_REPORT_031118
we need a time line.
for ex = replacing all the bad treess in the master compound 40=A0 april 1-15. then stone
work entire compoind 4 1= - 5 15. ? floors aprill - may 5. Q=A0 etc. a full contstrcution time line. Id also li=e to see
price s for ex . flooring etc.
On Sun, Mar 11, 2018 at=10:36 PM, LSJ GSJ <theethatieseetreetp@rneibeerer
» wrote:
Good EveningAttached Project Report for L.S1 & GSJ
Warmest regards4,=A0
Karen
conversation-id 13026 date-last-viewed 0 date-received 1520806811 flags 8590195713 gmail-label-ids 7 remote-
id 803657
1
EFTA_R1_01641458
EFTA02509922
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Phone Numbers
Document Details
| Filename | EFTA02509922.pdf |
| File Size | 41.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 749 characters |
| Indexed | 2026-02-12T18:38:44.208292 |