EFTA02520977.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Russell Hernandez
Sent:
Saturday, February 24, 2018 1:42 AM
To:
jeffrey E.
Subject:
Re: I.s.j tile job
Not in the tile we left at Isj
36=36 may be too big for those small cottages
Russell Hernandez </=pan>
On Feb 23, 2018, at 8:35 P=, jeffrey E. <jeevacation@gmail=com <mailto:jeevacation@gmail.com> wrote:
36by 36?
On Fri, Feb 23,=2018 at 8:20 PM Russell Hernandez
<mailto
> wrote:
Cabanas and cottages
Tile. R=placement
We can get 24x24 tile as well for less than $6 a s=uare foot material only
Russell Hernandez
Begin forwarded message:
</=iv>
From:=/b> Mark Libonati
<mailto
Date: Februa
23,=2018 at 7:36:52 PM EST
To: Russell
<mailto
>=/div>
Subject: Fwd: I.s.j tile job
Tile demo and install proposal=
EFTA_R1_01657983
EFTA02520977
Sent from=my iPhone
Begin forwarded message:
From: lemmond luciano
<mailt°
Da=e: Februar 23 2018 at 7:25:56 PM EST
To:
Subject: I.s.j tile job
<mailto:
=/blockquote>
<=iv class="m_9212437426419872272gmail-m_666623224357417352gmail-aHl
m_9212=37426419872272gmail-adNr>
=div class="m_9212437426419872272gmail-m_666623224357417352gmail-
m_1200071=93555453421gmail-utdU2e">
</=iv>
=div class="m_9212437426419872272gmail-m_666623224357417352gmail-
m_1200071=93555453421gmail-m_9179456066868068671gmail-aHl m_9212437426419872272gmail-
=_666623224357417352gmail-m_1200071393555453421gmail-adM m_92124374264198722=2gmail-
m_666623224357417352gmail-adM m_9212437426419872272gmail-adMa>
=div class="m_9212437426419872272gmail-m_666623224357417352gmail-
m_1200071=93555453421gmail-adM m_9212437426419872272gmail-m_666623224357417352gmail-a=M
m_9212437426419872272gmail-adM" id="m_9212437426419872272gmail-m_666623=24357417352gmail-
m_1200071393555453421gmail-m_9179456066868068671gmail-:kl"=
=div class="m_9212437426419872272gmail-m_666623224357417352gmail-
m_1200071=93555453421gmail-m_9179456066868068671gmail-m_4501386099144689773gmail-utdU=e
m_9212437426419872272gmail-m_666623224357417352gmail-m_120007139355545342=gmail-
m_9179456066868068671gmail-adM m_9212437426419872272gmail-m_666623224=57417352gmail-
m_1200071393555453421gmail-adM m_9212437426419872272gmail-m_6=6623224357417352gmail-adM
m_9212437426419872272gmail-adM">
&n=sp;
&=bsp;
&=bsp; FLOORS
remove all existing fl=or tile- (coral stone) of cabins, (cabanas) #1 # 2 # 3 and #
4 and pl=ce in dumpster, 1,654 sf TOTAL $ 4,135
dray p=ck-level all floors 1,654 sf, TOTAL $ 4,135
instal= 1,654 sf of porcelain tile 18x18 on a straight pattern with 1/8 of a= inch
joint TOTAL 9,097
&nbs=;
PO0= CABANA
=div class="m_9212437426419872272gmail-m_666623224357417352gmail-
m_1200071=93555453421gmail-m_9179456066868068671gmail-m_4501386099144689773gmail-
m_57=9551058637048863gmail-utdU2e">
2
EFTA_R1_01657984
EFTA02520978
remove all ex=sting floor tile- ( coral stone) and place in dumpster, 496 sf
TOTAL $=1,240
dray pack-level entire floor 496 sf, TOTAL 5=1,240
install 496 sf of Carrera barbel tile 1=x18 or 12x12 on a straight pattern TOTAL $
3,7201
=nbsp;
=
STAF COTAGE
=div id="m_9212437426419872272gmail-m_666623224357417352gmail-
m_1200071393=55453421gmail-m_9179456066868068671gmail-m_4501386099144689773gmail-
m_57895=1058637048863gmail-:za"> remove all existing floor tile- in the porche= and place in dumpster, 569 sf TOTAL
$ 1,422
joint TOTAL $ 3,129
TOTAL $ 382
inch joint TOTAL $ 841
1 and=place in dumpster, TOTAL $ 709
=nstall 569 sf of porcelain tile 18x18 on a straight pattern with 1/8 o= an inch
&=bsp;
&=bsp;
C=BANA-EAST
remove all existing floor tile- ( coral stone) and p=ace in dumpster, 153 sf
dray pac=-Ievel entire floor 153sf, TOTAL $ 382
install&nbs=; 153 sf of porcelain tile 18x18 on a straight pattern with 1/8=of an
&nbs=;
BATHROOM CABANA # 1=br>
remove all walls=and shower floor tile- (coral stone) 189 sfof cabin (cabanas) #
<=iv class="m_9212437426419872272gmail-m_666623224357417352gmail-
m_12000713=3555453421gmail-m_9179456066868068671gmail-m_4501386099144689773gmail-
m_578=551058637048863gmail-aHl">
&=bsp;
&=bsp;
BATHROOM CABANA # 3
remove all&=bsp;walls and shower floor tile- (coral stone)152 sf of cabin
(cabana=) # 3 and place in dumpster, TOTAL $ 570
<=r>
&nbs=;
&nb=p;
BATHROOM CABANA-E=ST
<=iv class="m_9212437426419872272gmail-m_666623224357417352gmail-
m_12000713=3555453421gmail-m_9179456066868068671gmail-m_4501386099144689773gmail-
m_578=551058637048863gmail-aHl"> remove all walls and shower floo= tile- (coral stone) 132 sf of cabin (cabanas) #
EAST place in dumpster, TO=AL $ 495
< = >
3
EFTA_R1_01657985
EFTA02520979
can not give install=tion price for bathrooms walls until I see the type of tile
and&=bsp; installation pattern
THE PRICES ABOVE DO NOT INCLUDE ANY TYPE OF MATERIASLadiv>
<=div>
CORAL STONE AND COPING REPAIR Wi=l BE DONE BY THE HOUR WIHICH IS $30
PER HR FOR HELPER AN= 65 FOR INSTALER, PLUS MATERIALS
please n=te
The information contained in this communication is
confidenti=l, may be attorney-client privileged, may
constitute inside information,=and is intended only for
the use of the addressee. It is the property of=br>JEE
Unauthorized use, disclosure or copying of this
communication o= any part thereof is strictly prohibited
and may be unlawful. If you hav= received this
communication in error, please notify us immediately byreturn e-mail or by e-
mail tojeevacation@gmail.com <mailto:jeevacation@gmail.com> , and
destroy this communication a=d all copies thereof,
including all attachments. copyright -all rights r=served
4
EFTA_R1_01657986
EFTA02520980
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA02520977.pdf |
| File Size | 282.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,556 characters |
| Indexed | 2026-02-12T18:46:03.573861 |