Back to Results

EFTA00259015.pdf

Source: DOJ_DS9  •  Size: 1134.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

Rough Notes/Punch List from January 6, 2019 meeting on LSJ JE, and attending 1. Confirm turbo charger for lull was on plane — confirmed. sent picture. 2. order new lull 3. order new dump truck 4. order new fuel truck 5. order new flat bed 6. order new tractor 7. order new hydro seeder 8. order new man lift 9. order new push lawn mower 10. order new roller 11. order new trencher 12. order new larger fertilizer sprayer 13. order hydraulic hose machine 14. order tire changer for commercial vehicles 15. order new jet ski 16. Confirm condition of most recently purchased tractor and what needs to be done to it to make it fully operable. 17. Nautica and Sportis are both to be ready by January 30, 2019 18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica and Sportis are back up and running — est. to start by Feb 1. 19. new barge that is wider to accommodate two concrete trucks EFTA00259015 20. barge and "Bubbler[sp?] 21. Omega Electric —= to handle demand letter after getting backup from 22. Pro Solar — follow up with 23. Generator Bunker — Architect and Engineer 24. I= Cottage — addition and main — by February 15, 2019 25. Gym — Replace Equipment 26. Fiber to be installed for RO by Feb 20, 2019 27. RO for GM — work to be done; and by whom 28. Step Up Transformer for Cable 29. Step down transformer for Cable 30. Need to engineer a switch for when Cable from LSJ to GSJ fails 31. Engineering doors (28) — confirm arrival dates 32. Chillax Bath A/C— Reefco — when will it be finished 33. Roof Materials — No new EFIS — check with 34. Septic Tanks — hole dug — dates from 35. WIFI — Review ABL bids by Friday— Brice to send bids to and to review. 36. [Dock?) pebble beach — Friday 37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019 38. Wooden Nursery Steps —JE to review 39. Service Doors and Service Gates — Bamboo Coverings 40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or January 10, 2019 EFTA00259016 4 41. Planter by Pool wall 42. Christmas Cove Dock 43. Tiki Hut Kitchen —JE to choose color 44. Nursery Steps —JE to review 45. Waterfall layout —JE to review 46. Grotto —JE to review 47. Five Palms Electrical — Answer by January 9, 2019 48. Cabana 3 — Artistic Tile to be ordered by January 7, 2019 49. Maids and crew — Decision regarding EM to serve as point person for supervision 50. Debris and materials on top of RO to be cleaned up immediately 51. Cost You Less --to sort out by January 10, 2019 52. LSJ — doing Roads — MI to speak to RK 53. Dock Lights --to follow up with the person hired for this work 54. Staff Bathrooms 55. Under Cabana 2 — storage and piping 56. Island Oxygen bottles 57. First Aid Kits for all locations on both Islands 58. Pool Heater 59. Cistern Drains for Main Compound 60. Hurricane Prep Materials organized and accounted for 61. Solar System for Flagpole on GSJ 62. Reek° Library Issues — larger intake filter, intake pump, 3-day valve, etc. EFTA00259017 63. Staff Cottage Dryer— Purchase one appropriate for propane use 64. Pool Rooms electrical panels replacement 65. Power to beach for Captains below staff cottage. 66. New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift 67. Blue Beach office — electric transformer 68. Staff Cottage water heater issues — dugout underneath Staff Cottage. 69. Refurbish water distribution manifold 70. Furniture package — to complete by January 11, 2019 71. Pebble Beach house — 2 additional crew members requested 72. Security — including power & internet to docks so motion detecting Ring devices can be installed 73. MI to review household supplies and cleaning equipment and materials needed 74. Water flowing up hillside on GSJ [location not clear from notes] 75. New kitchen fridge for cottage 76. Countertops and Vanities everywhere on GSJ and LSJ 77. —people—June 17 EFTA00259018 Rough Notes/Punch List from January 6, 2019 meeting on LSJ JE, and attending 1. Confirm turbo charger for lull was on plane — confirmed.. sent picture. 2. order new lull 3. order new dump truck 4. order new fuel truck 5. order new flat bed 6. order new tractor 7. order new hydro seeder 8. order new man lift 9. order new push lawn mower 10. order new roller 11. order new trencher 12. order new larger fertilizer sprayer 13. order hydraulic hose machine 14. order tire changer for commercial vehicles 15. order new jet ski 16. Confirm condition of most recently purchased tractor and what needs to be done to it to make it fully operable. 17. Nautica and Sport's are both to be ready by January 30, 2019 18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica and Sportis are back up and running — est. to start by Feb 1. 19. new barge that is wider to accommodate two concrete trucks EFTA00259019 20. barge and "Bubbler"[sp?] 21. Omega Electric — Darren to handle demand letter after getting backup from 22. Pro Solar — follow up with 23. Generator Bunker — Architect and Engineer 24. Cottage — addition and main — by February 15, 2019 25. Gym — Replace Equipment 26. Fiber to be installed for RO by Feb 20, 2019 27. RO for GSJ — work to be done; and by whom 28. Step Up Transformer for Cable 29. Step down transformer for Cable 30. Need to engineer a switch for when Cable from LSJ to GSJ fails 31. Engineering doors (28)— confirm arrival dates 32. Chitlax Bath A/C — Reefco — when will it be finished 33. Roof Materials— No new EFTS — check with 34. Septic Tanks— hole dug — dates from 35. WIFI — Review ABL bids by Friday — Brice to send bids to and to review. 36. (Dock?) pebble beach — Friday 37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019 38. Wooden Nursery Steps —JE to review 39. Service Doors and Service Gates — Bamboo Coverings 40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or January 10, 2019 EFTA00259020 i 41. Planter by Pool wall 42. Christmas Cove Dock 43. Tiki Hut Kitchen —JE to choose color 44. Nursery Steps — JE to review 45. Waterfall layout —JE to review 46. Grotto —JE to review 47. Five Palms Electrical — Answer by January 9, 2019 48. Cabana 3 —Artistic Tile to be ordered by January 7, 2019 49. Maids and crew— Decision regarding to serve as point person for supervision 50. Debris and materials on top of RO to be cleaned up immediately 51. Cost You Less --to sort out by January 10, 2019 52. LS1— doing Roads — OKI to speak to RK 53. Dock Lights --to follow up with the person hired for this work 54. Staff Bathrooms 55. Under Cabana 2 — storage and piping 56. Island Oxygen bottles 57. First Aid Kits for all locations on both Islands 58. Pool Heater 59. Cistern Drains for Main Compound 60. Hurricane Prep Materials organized and accounted for 61. Solar System for Flagpole on GSJ 62. Reefco Library Issues — larger intake filter, intake pump, 3-day valve, etc. EFTA00259021 63. Staff Cottage Dryer — Purchase one appropriate for propane use 64. Pool Rooms electrical panels replacement 65. Power to beach for Captains below staff cottage. 66. New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift 67. Blue Beach office — electric transformer 68. Staff Cottage water heater issues — dugout underneath Staff Cottage. 69. Refurbish water distribution manifold 70. Furniture package —IN to complete by January 11, 2019 71. Pebble Beach house — 2 additional crew members requested 72. Security — including power & internet to docks so motion detecting Ring devices can be installed 73. to review household supplies and cleaning equipment and materials needed 74. Water flowing up hillside on GSJ [location not clear from notes] 75. New kitchen fridge for cottage 76. Countertops and Vanities everywhere on GSJ and LSJ 77. people —June 17 EFTA00259022 Rough Notes/Punch List from January 6, 2019 meeting on LSJ JE, and attending 1. Confirm turbo charger for lull was on plane — confirmed. Brice sent picture. 2. order new lull 3. order new dump truck 4. order new fuel truck 5. order new flat bed 6. order new tractor 7. order new hydro seeder 8. order new man lift 9. order new push lawn mower 10. order new roller 11. order new trencher 12. order new larger fertilizer sprayer 13. order hydraulic hose machine 14. order tire changer for commercial vehicles 15. order new jet ski 16. Confirm condition of most recently purchased tractor and what needs to be done to it to make it fully operable. 17. Nautica and Sportis are both to be ready by January 30, 2019 18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica and Sportis are back up and running — est. to start by Feb 1. 19. new barge that is wider to accommodate two concrete trucks EFTA00259023 20. barge and "Bubbler"[sp?] 21. Omega Electric --to handle demand letter after getting backup from. 22. Pro Solar— follow up with 23. Generator — Architect and Engineer 24. I= Cottage — addition and main — by February 15, 2019 25. Gym — Replace Equipment 26. Fiber to be installed for RO by Feb 20, 2019 27. RO for GSJ — work to be done; and by whom 28. Step Up Transformer for Cable 29. Step down transformer for Cable 30. Need to engineer a switch for when Cable from LSJ to GSJ fails 31. Engineering doors (28) — confirm arrival dates 32. Chillax Bath A/C — Reefco — when will it be finished 33. Roof Materials — No new EFIS — check with 34. Septic Tanks — hole dug — dates from 35. WIFI — Review ABL bids by Friday — Brice to send bids to and." to review. 36. [Dock?) pebble beach — Friday 37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019 38. Wooden Nursery Steps —JE to review 39. Service Doors and Service Gates — Bamboo Coverings 40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or January 10, 2019 EFTA00259024 41. Planter by Pool wall 42. Christmas Cove Dock 43. Tiki Hut Kitchen —JE to choose color 44. Nursery Steps —JE to review 45. Waterfall layout — JE to review 46. Grotto — JE to review 47. Five Palms Electrical — Answer by January 9, 2019 48. Cabana 3 — Artistic Tile to be ordered by January 7, 2019 49. Maids and crew — Decision regarding to serve as point person for supervision 50. Debris and materials on top of RO to be cleaned up immediately 51. Cost You Less —IN to sort out by January 10, 2019 52. LSJ --doing Roads — Mit° speak to 0 53. Dock Lights --to follow up with the person hired for this work 54. Staff Bathrooms 55. Under Cabana 2 — storage and piping 56. Island Oxygen bottles 57. First Aid Kits for all locations on both Islands 58. Pool Heater 59. Cistern Drains for Main Compound 60. Hurricane Prep Materials organized and accounted for 61. Solar System for Flagpole on GSJ 62. Reefco Library Issues — larger intake filter, intake pump, 3-day valve, etc. EFTA00259025 63. Staff Cottage Dryer— Purchase one appropriate for propane use 64. Pool Rooms electrical panels replacement 65. Power to beach for Captains below staff cottage. 66. New sewage treatment for staff cottage on (Si. Eliminate septic tank and install lift 67. Blue Beach office — electric transformer 68. Staff Cottage water heater issues— dugout underneath Staff Cottage. 69. Refurbish water distribution manifold 70. Furniture package — to complete by January 11, 2019 71. Pebble Beach house — 2 additional crew members requested 72. Security — including power & Internet to docks so motion detecting Ring devices can be installed 73. to review household supplies and cleaning equipment and materials needed 74. Water flowing up hillside on GSJ [location not clear from notes) 75. New kitchen fridge for cottage 76. Countertops and Vanities everywhere on GSJ and LSJ 77. people —June 17 EFTA00259026 Rough Notes/Punch List from January 6, 2019 meeting on LSJ JE MIP and-attending - 1. Confirm turbo charger for lull was on plane — confirmed.. sent picture. 2. order new lull 3. order new dump truck 4. order new fuel truck 5. order new flat bed 6. order new tractor 7. order new hydro seeder 8. order new man lift 9. order new push lawn mower 10. order new roller 11. order new trencher 12. order new larger fertilizer sprayer 13. order hydraulic hose machine 14. order tire changer for commercial vehicles 15. order new jet ski 16. Confirm condition of most recently purchased tractor and what needs to be done to it to make it fully operable. 17. Nautica and Sportis are both to be ready by January 30, 2019 18. Little C scheduled for refit and cleanup to take approx 2 weeks and to start once Nautica and Sportis are back up and running — est. to start by Feb 1. 19. new barge that is wider to accommodate two concrete trucks EFTA00259027 20. barge and 'Bubbler" sp?) 21. Omega Electric — to handle demand letter after getting backup from 22. Pro Solar — follow up with 23. Generator Bunker —Architect and Engineer 24. Cottage — addition and main — by February 15, 2019 25. Gym — Replace Equipment 26. Fiber to be installed for RO by Feb 20, 2019 27. RO for GSJ — work to be done; and by whom 28. Step Up Transformer for Cable 29. Step down transformer for Cable 30. Need to engineer a switch for when Cable from LSJ to GSJ fails 31. Engineering doors (28) — confirm arrival dates 32. Chillax Bath A/C— Reefco — when will it be finished 33. Roof Materials — No new EFIS — check with 34. Septic Tanks — hole dug — dates from 35. WIFI — Review ABL bids by Friday — Brice to send bids to Darren and Darren to review. 36. (Dock?) pebble beach — Friday 37. Confirm awnings shipped and will be picked up on January 9 or January 10, 2019 38. Wooden Nursery Steps —JE to review 39. Service Doors and Service Gates — Bamboo Coverings 40. Controllers for RO Distribution Pumps at Tropical to be picked up on January 9 or January 10, 2019 EFTA00259028 41. Planter by Pool wall 42. Christmas Cove Dock 43. Tiki Hut Kitchen — JE to choose color 44. Nursery Steps — JE to review 45. Waterfall layout —JE to review 46. Grotto —JE to review 47. Five Palms Electrical — Answer by January 9, 2019 48. Cabana 3 — Artistic Tile to be ordered by January 7, 2019 49. Maids and crew— Decision regarding to serve as point person for supervision 50. Debris and materials on top of RO to be cleaned up immediately) Ns, 51. Cost You Less — to sort out by January 10, 2019 .0.•••• 52. LSJ — doing Roads — DKI to speak to RK 53. Dock Lights --to follow up with the person hired for this work 54. Staff Bathrooms 55. Under Cabana 2 — storage and piping 56. Island Oxygen bottles b 57. First Aid Kits for all locations on both Islands 58. Pool Heater 59. Cistern Drains for Main Compound 60. Hurricane Prep Materials organized and accounted for 61. Solar System for Flagpole on GSJ g 62. Reefco Library Issues — larger intake filter, intake pump, 3-day valve, etc. EFTA00259029 t 63. Staff Cottage Dryer — Purchase one appropriate for propane use 64. Pool Rooms electrical panels replacement 65. Power to beach for Captains below staff cottage. 66. New sewage treatment for staff cottage on LSJ. Eliminate septic tank and install lift 67. Blue Beach office — electric transformer 68. Staff Cottage water heater issues — dugout underneath Staff Cottage. 69. Refurbish water distribution manifold 70. Furniture package — IMI to complete by January 11, 2019 71. Pebble Beach house — 2 additional crew members requested 72. Security— including power & intemet to docks so motion detecting Ring devices can be installed 73. MI to review household supplies and cleaning equipment and materials needed 74. Water flowing up hillside on GSJ [location not clear from notes] 75. New kitchen fridge for cottage 76. Countertops and Vanities everywhere on GSJ and LSJ 77. people —June 17 EFTA00259030 Little Saint James EFTA00259031 Little Saint James EFTA00259032 Little Saint James EFTA00259033 Little Saint James A EFTA00259035 --I J / EFTA00259036

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00259015.pdf
File Size 1134.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 16,581 characters
Indexed 2026-02-11T12:41:31.021811
Ask the Files