EFTA00285727.pdf
PDF Source (No Download)
Extracted Text (OCR)
BBA
BRYAN BROWN ARCHITECTS, WC
55 Westchester Ave
Pound Ridge NY
10576
January 18 2018
Dear Jeffrey.
Thank you for the meeting the other day and showing me your islands. I am honored to have been asked
to submit a proposal for my architectural design team for your properties. I can see this as an
extraordinary opportunity to create a strong and engaging sense of place by transforming the sites in a
dramatic way.
Attached to my email are two portfolios. One is the work I've completed called BBA. And the other
images book is inspiration images so we can talk about things you like and the design direction you
want to go.
We have discussed the budget and timeframes with your team and BBA has created a fee that is
professionally suitable for your project. Based on the conversations we are proposing an hourly fee.
Principal's Time
$375.00/hour
Senior Project Manager's Time
$275.00/hour
Project Managers' Time
$175.00/hour
Draftsman's' Time
$125.00/hour
Clerical Time
$50.00/hour
Consultants
At Cost
Reimbursable expenses, billable at cost, printing and photocopying specification books, travel
associated with meetings or selections associated with the project.
BBA will prepare the appropriate documents for construction. We will also assist you and your team in
obtaining proposals from all consultants and assist in awarding and preparing the contracts for their
work.
It would be a pleasure to work with you on your extraordinary property.
Best Regards,
B
n rown, AIA
Principal
EFTA00285727
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00285727.pdf |
| File Size | 48.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,539 characters |
| Indexed | 2026-02-11T13:22:40.242597 |