Back to Results

EFTA00285735.pdf

Source: DOJ_DS9  •  Size: 26.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

2019 August Wed. Aug.7, 2019 Reminder: G550 must arrive the Brunswick GA Gulfstream facility to prep tail section Reminder: Jermaine out of the office to take a course August 21-27 Sun. Aug. 18, 2019 Reminder: Joscha Bach to travel from Berlin to San Francisco LH454 (Rec. La Mon. AuQ. 12.2019 Reminder: Larry signed up the G550 for the 144 month & NDT (Non-Destructive Test) of the horizontal stabilizer to commence on Aug. 12/will be down 4-5 weeks Wed. August 21, 2019 Reminder: Jermaine out of the office to take a course August 21-27 EFTA00285735

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00285735.pdf
File Size 26.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 562 characters
Indexed 2026-02-11T13:22:40.269785
Ask the Files