Back to Results

EFTA00299433.pdf

Source: DOJ_DS9  •  Size: 50.5 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

Stepping Stones M & G LLC 3 Morse Court New Canaan, CT 06840 Name / Address Groff, Lesle Estimate Date Estimate U 6/3/2013 28.16 Project Masterbath Fabricati... Description Qty Rate Amount Unit sq.ft.o pcs Total Masterbath Fabrication Material and fabrication of 3cm White 2 1,957.00 3,914.00 3,914.00T Zues Silestone Vanity. Based on 11.15 Sq.Ft. of material with undermount sink cut out and 7.75 linear fl. of Eased edging and 7.75 linear feet of 4" backsplashes. Trade Discount -10.00% -391.40 -391.40 Labor to template and install Vanity. 1 280.00 280.00 280.00 To change edging from Eased egde to 2" 0.00 0.00 0.00T Mitered edge, an additional cost of $775.00 will be added to each vanity. To change from Silestone to White Pental 0.00 0.00 0.00T Quartz, an additional cost of S 780.50 will be added to this estimate. Material & Fabrication of 2cm White 1 1,435.55 1,435.55 1,435.55T Cararra Marble Shower Jambs. Based on 26.1 linear feet of material (Does not include ceiling). Trade Discount -10.00% -143.56 -143.56 Material & Fabrication of 2cm White 1 175.00 175.00 175.00T Cararra Corner Shower Seat. Based on 18"x18" with front edge eased. Trade Discount -10.00% -17.50 -17.50 Subtotal $5,252.09 Sales Tax (6.35%) $315.73 Total $5,567.82 EFTA00299433

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00299433.pdf
File Size 50.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,340 characters
Indexed 2026-02-11T13:24:27.988303
Ask the Files