EFTA00299442.pdf
PDF Source (No Download)
Extracted Text (OCR)
Stepping Stones M & G LLC
3 Morse Court
New Canaan CT 06840
Name / Address
Groff. Lesle
Estimate
Date
Estimate U
9/24/2013
2847
Project
Lath
2, Bath 3 & Ba...
Description
Qty
Rate
Amount
Unit
sq.ft.o pcs
Total
Bath #2/Son's
Bone Gloss MM 3x6 - Sh Walls & ceiling
150
5.00
750.00
750.00T
& 12" Around Tub Deck
Bone Gloss MM Bullnose 3x6, 6" side
56
2.25
126.00
126.00T
Driftwood Light Beige I2x24 - Rm Floor
65
5.32
345.80
345.80T
Bone Matte 2x2 - shower floor
16
7.72
123.52
123.52T
Gla22i0 Sable Brown #B200 4x 12 - Based
around 12" for tub backsplash & 6" shower
border & Vanity
39
14.62
570.18
570.18T
Bath #3/Guest
Driftwood Light Grey 12x24 - Rm Floor
65
5.32
345.80
345.80T
Driftwood Light Grey 12x24 - Sh walls,
100
5.32
532.00
532.00T
Vertical (No ceiling)
Driftwood Light Grey lx1 - (4) rows for
border in shower or Random Accent
3
2114
75.42
75.42T
Tender Grey Matte 2x2 - Sh floor
11
7.72
84.92
84.92T
Driftwood Light Grey Bullnose 3x24
14
11.59
162.26
162.26T
Bath #4/Nanny's
Driftwood Light Beige 12x24 - Rm Floor,
60
5.32
319.20
319.20T
Driftwood Light Beige 12x24 - Sh wall
horizontal & ceiling
125
5.32
665.00
665.00T
Bone Matte 2x2 - Sh Floor
15
7.72
115.80
115.80T
Driftwood Light Beige Bullnose 3x24
14
11.59
162.26
162.26T
Delivery Charge to Norwalk Warehouse
1
300.00
300.00
300.00T
Subtotal
Sales Tax (6.35%)
Total
Page 1
EFTA00299442
Stepping Stones M & G LLC
3 Morse Court
New Canaan, CT 06840
Name / Address
Groff. Lesle
Estimate
Date
Estimate U
9/24/2013
2847
Project
Lath
2, Bath 3 & Ba...
Description
Qty
Rate
Amount
Unit
sq.ft.o Dos
Total
This is a non-stocked item. The above
materials are special order items which are
non-returnable. Your material will be
ordered based upon receiving a deposit &
full payment is required before material
can be shipped/picked up. Please note that
we are not responsible for measurements &
no retums/cancellations will be taken once
a deposit is received. All material picked
up at Stepping Stones must be opened &
inspected at our facility. No claims will be
honored after your order has left our
facility for any damaged merchandise or
shortages.
0.00
0.00
0.00T
Subtotal
$4,678.16
Sales Tax (6.35%)
$297.06
Total
$4,975.22
Page 2
EFTA00299443
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00299442.pdf |
| File Size | 87.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,361 characters |
| Indexed | 2026-02-11T13:24:28.034692 |