EFTA00301938.pdf
PDF Source (No Download)
Extracted Text (OCR)
Stepping Stones M & G LLC
Invoice
3 Morse Court
New Canaan, CT 06840
Ph: 203-966-7317
Fx: 203-966-7318
Bill To
Groff, Lesle
Date
Invoice #
8/23/2013
2753
P.O. Number
Terms
Rep
Ship
Via
F.O.B.
Project
8/23/2013
Masterbath Fabrication
Quantity
I em Code
Description
Price
Store
Unit
Amount
Masterba0t Fabrication
New Canaan ...
1.2 Kitchen
Material and fabrication of 3cm White Cararra
1,334.75 New Canaan ...
1,601.70T
Honed Vanity. Based on 11.15 Sq.Ft. of
material with Vessel sink cut out and 735
linear ft. of Eased edging and 7.75 linear feet
of 4" backsplashes.
Trade Discount
Trade Discount
-10.00% New Canaan ...
-160.17
0.6 Temp/Install
Labor to template and install Vanity.
280.00 New Canaan ...
168.00
0.6 Seat/Saddles/...
Material & Fabrication of 2cm White Cararra
1,435.55 New Canaan ...
861.33T
Marble Shower Jambs. Based on 26.1 linear
feet of material (Does not include ceiling).
Trade Discount
Trade Discount
-10.00% New Canaan ...
-86.13
0.6 Seat/Saddlesf...
Material & Fabrication of 2cm White Cararra
175.00 New Canaan ...
105.OOT
Corner Shower Seat. Based on 18"x18" with
front edge eased.
Trade Discount
Trade Discount
-10.00% New Canaan ...
-10.50
CT Sales Tax
6.35%
146.76
Total
52.625.99
EFTA00301938
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00301938.pdf |
| File Size | 51.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,296 characters |
| Indexed | 2026-02-11T13:24:51.776389 |