MAHO BAY USVI, LLC: Construction Schedule ST JOHN, USVI ID Task Name Duration Start Finish Complete 1 Pool Shade Structure & Engineering Doors 45 days Mon 6/10/19 Fri 8/9/19 0% 2 Engneering doors removal and installation 5 days Mon 6/10/19 Fri 6/14/19 0% 7 Long Lead Procurement 14 days Wed 5/29/19 Mon 6/17/19 0% 8 6" Square or 4"x6" structural steel tube 2 wks Wed 5/29/19 Tue 6/11/19 0% 9 Mobilize on Site 2 days Mon 6/10/19 Tue 6/11/19 0% 10 Delivery of Trash Bin or bins to LSJ 1 day Thu 6/6/19 Thu 6/6/19 0% 11 Delivery of doors to site location and installation 2 days Mon 6/10/19 Tue 6/11/19 0% 12 Demolition of existing Pool Shade structure 2 days Mon 6/17/19 Tue 6/18/19 0% 13 Demolition of existing conc. Slab for new footing 2 days Wed 6/19/19 Thu 6/20/19 0% 14 8 -New Column Footing 7 days Fri 6/21/19 Mon 7/1/19 0% 15 Steel Reinforcement and poured conc. Footing 3 days Fri 6/21/19 Tue 6/25/19 0% 16 Form work for( 8) 16" square concrete columns 2 days Fri 6/21/19 Mon 6/24/19 0% Task Finish-only Split External Tasks Milestone External Milestone • Summary Deadline Project Summary Critical Inactive Task Critical Split Inactive Milestone Late Page 1 of 6 Inactive Summary Baseline Manual Task Baseline Milestone O Duration-only Baseline Summary Summary Rollup Progress Manual Manual Progress Manual Summary Start-only Slack EFTA00305825 MAHO BAY USVI, LLC: Construction Schedule ST JOHN, USVI ID Task Name Duration Start Finish Complete 17 (8) Poured in place 16" square concrete columns 4 days Tue 6/25/19 Fri 6/28/19 0% 18 Saw Cut trench in conc. Slab for new light fixture locations 1 day Fri 6/21/19 Fri 6/21/19 0% 19 Roofing 20 days Mon 7/1/19 Fri 7/26/19 0% 20 Installation of Steel beams 1 day Mon 7/1/19 Mon 7/1/19 0% 21 Roof framing 10 days Mon 7/1/19 Fri 7/12/19 0% 22 Roof Decking and Weather Protection 3 days Mon 7/15/19 Wed 7/17/19 0% 23 Installation of Concrete Roofing Tiles 9 days Fri 7/19/19 Wed 7/31/19 0% 24 Building Finishes 9 days Thu 8/1/19 Tue 8/13/19 0% 25 Tiling 5 days Thu 8/1/19 Wed 8/7/19 0% 26 Electrical 1 day Thu 8/1/19 Thu 8/1/19 0% 27 Installation of light fixltures and wiring 2 days Thu 8/1/19 Fri 8/2/19 0% 28 Final Clean-up 1 day Thu 8/8/19 Thu 8/8/19 0% Task Finish-only Split External Tasks Milestone External Milestone • Summary Deadline Project Summary Critical Inactive Task Critical Split Inactive Milestone Late Page 2 of 6 Inactive Summary Baseline Manual Task Baseline Milestone O Duration Baseline Summary -only Summary Rollup Progress Manual Manual Progress Manual Summary Start-only Slack EFTA00305826 IMAHO BAY USVI, LLC: Construction Schedule ST JOHN, USVI D Task Name 29 Substantial completion date 30 Complete Final Inspections 31 Complete punch list items from all inspections Duration 1 day Thu 8/8/19 Thu 8/8/19 0% 1 day Fri 8/9/19 Fri 8/9/19 0% 1 day Fri 8/9/19 Fri 8/9/19 0% Start !Finish Complete Task Finish-only Split External Tasks ]=Im Milestone External Milestone • Summary Deadline Project Summary Critical Inactive Task Critical Split Inactive Milestone Late Page 3 of 6 Baseline Inactive Summary Manual Task Baseline Milestone Duration•only Baseline Summary Manual Summary Rollup Progress Manual Summary Manual Progress Start-only Slack EFTA00305827 MAHO BAY USVI, LLC: Construction Schedule ST JOHN, USVI Resource Names Predecessors 2019 12016 12017 12018 12019 12020 LW LSI Tricon Tricon Tricon Tricon Tricon aricon _iricon II- aricon aricon Page 4 of 6 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only I I II 11.1 1111 1 Finish-only External Tasks External Milestone Deadline Critical Critical Split Late Baseline Baseline Milestone Baseline Summary Progress Manual Progress Slack 4- EFTA00305828 MAHO BAY USVI, LLC: Construction Schedule ST JOHN, USVI Resource Names Tricon Tricon Tricon Tricon Tricon Tricon Tricon Predecessors 21 2015 12016 2017 12018 12019 12020 1Jricon aricon Tricon Tricon Tricon Tricon L Tricon Task Split Milestone Finish-only External Tasks External Milestone ■ • Summary Deadline • Project Summary ■ Critical Inactive Task Critical Split Inactive Milestone Late ■ Page 5 of 6 Inactive Summary Baseline Manual Task Baseline Milestone Duration-only Summary Baseline Manual Summary Rollup Progress Manual Summary Manual Progress Start-only Slack EFTA00305829 MAHO BAY USVI, LLC: Construction Schedule ST JOHN, USVI Resource Names Tricon LSJ,Tricon Predecessors 2018 12016 12017 12018 12019 2020 Tricon LSJ,Tricon Page 6 of 6 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Late Baseline Baseline Milestone Baseline Summary Progress Manual Progress Slack • O EFTA00305830

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00305825.pdf
File Size 239.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 5,338 characters
Indexed 2026-02-11T13:25:11.809350
Ask the Files