Nlorpire Group Int.
AN
oteoP
JIRO Sli II 'or ItteW
I
nip
No!),
February 2, 2010
James A. Jackson, Pr.
Paged,Vintager
Mr. Gary Kerney -Representing I Si LLC (master agreement "owner')
Landmark Land Co.
GROUP
2817 Crain Ilwy
tipper Marlboro MI) 20774
Procured through
IIIIRK Associates Inc.
PO Box •100.
New York. NY 10150
RE:
Engineering /Architectural Services — Work Order No. IS.
Construction Administration Services for the Mechanical Building
Dear Mr. Kerney:
Maguire Group Inc. (Maguire) is pleased to present this proposal for Work Order No. 18
under our Master Agreement to provide architectural and engineering services for Link St.
James Island. This Work Order is based on the general scope or services, terms, and conditions
described in the Abbreviated Standard Form o[ Agreement Between Owner (IM. LLC )(ad
Architect (Maguire Group) herein known as the Master Agreement, dated February 1, 2007.
The following revisions shall apply to the master agreement:
I.
Maguire Group Inc. address shall be revised to 33 Commercial Street, Foxhorough MA
02035
2.
Molyneux Studio or any reference to Molyneux shall be replaced by Owner's interior
designer or representative.
3.
Paragraph 1.1.1 "Owners Design Team" spokesperson shall be Gary Kerney in place of
Douglas Schmidt!.
In general. the services proposed in Work Order No. lli includes architectural, civil, st mound.
mechanical, electrical, and plumbing construction adminisinttion services for the Mechanical
Building. A more specific description of the project scope and services to be provided is as
lb I lows:
Winne! .1 nrir Po eshAldird ;health
Eeeelbm e
EFTA00306911
GROUP
link Sr. James
Mr. (Jal) Kerney
Page 2 or .5
Scope
he second phase of the mechanical building construction will include building the
structure as essentially designed between columns I through 7. Water production to he
reduced to approximately I 00,000 gallons per day utilizing reverse osmosis units design of
which including specific room requirements to he programmed by others. but implemented
into the floor plan design.
Construction Adminisiration: 'this will include shop drawing review. request for
in flinmaiim responses. construction sketches mid any site investigations or inspections
deemed necessary.
Deliverables
Maguire will review and comment on shop drawings and respond to contractors R El's.
Fee
The scope of services is as anticipated in the Master Agreement and as generally described
above. We propose to engage in the design services on an hourly basis, utilizing the hourly
billing rates attached plus reimbursable expenses. Reimbursable expenses shall consist of mail,
printing. travel. lodging etc.. Invoices will be submitted monthly based upon the hours and
expenses charged directly to the project in the proceeding month. For financial planning
purposes. we suggest the establishment of Work Order No. 13 budgets us hdlows:
Project Management
32 has ?a, 5130
$4,160
Administrative
32 kr.
'a 7S70
52,240
Architecture
4(1 has a N I 15
S4490
Structural
40 hrs fit 1155
$4,600
Mechanical
40 has (it' 5115
$4,600
Electrical
40 his fit SI IS
$4,690
Plumbing
40 has Ott SI IS
54,600
Water Production
40 firs (9! S I IS
54,6110
Site/Civil
24 Ins a SI IS
$2.760
Reimbursable Expenses
$500.00
Tooth
%mum)
OK-
Wawa. el /iv. in,...iikutial,lwar(6. fur I +4.
rweilen.
EFTA00306912
Little Sr. James I C
Mr Gary Kerney
Page 3 oil
GROUP
"rhis budget is open ended and is not a "NO I -TO-EXCEED IlUDGE1 as past history with I.S.I
projects dielinas multiple scope changes are expected throughout design and construction.
Maguire has and will continue to he diligent mid responsive to the clients needs. Your signature
will be considered notice to proceed. Please fed free to call me if you have any questions. We
look forward to working with the LSJ, Lafayette and I II1RK team once again.
Very truly yaws.
MAGUI RE GROUP, INC.
lllllr
te, n.
Jlikths,Vil.
I I.
Protect 1i/tanager • Land Development
Approved and accepted this
day of
2009
tiary Kerney- fin I. inle St. James, I. LC
cc:
William Bowles I,SJ Construction
Thomas I termer -Mt il,
Eric Douglas- M(il, Files
Wilma of As,. ft, adtritial A inn rA /iu II, Alps I.).-, I& ;in
EFTA00306913
Daphne Wallace
From:
Emad Hanna
Sent:
Thursday, February 18, 2010 11:35 AM
To:
Daphne Wallace
Subject:
FW: JE Approvals
Attachments:
JE Approvals.pdf
See the attached changes
From: Monique Harry [mailto
Sent: Thursday, February 18, 2010 6:25 AM
To: Emad Hanna; Rich Kahn; Darren Indyke (AOL)
Subject: JE Approvals
Good Morning,
Please find attached the signed approvals by JE for the following;
1. Budget adjustment for Master Suite #1004
2. Budget adjustment for MSOSI #1005
Please Amend the Original Budgets reflecting these increases.
3. The Maguire Work Order #18
Please note on the MSOSI Budget Adjustment the Irrigation has been revised and will cover the submitted invoice
from Saint Jan Botanical, so process payment for the amount of $3,495.00
Information forwarded by Gary's Request.
Monique Harry
LS) LLC Construction
6100 Red Hook Qtr Suite A2-7
St. Thomas, USVI 00802
Telephone
Fax
Hotmail: Powerful Free email with security by Microsoft. Get it now.
1
EFTA00306914
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00306911.pdf |
| File Size | 398.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,335 characters |
| Indexed | 2026-02-11T13:25:20.796249 |