LSJ PUNCH LIST
Item
Department
Description
Completion Date
Big N Barge
Bosco
Bosco & Roy to address issues. Parts Ordered 4/18
Little C
Carlos
Parts ordered 4/16 -
PRD Engine
Carlos
Fuel getting into oil. Take to Offshore for repair.
Trampoline
Carlos
Clean hardware, replace lines and reinstall on mooring. .e(C..-, 1.--r3dif2f
Build House for new library chiller
Carpentry
Have materials must uninstall the old chiller. Plumbing started 4/18
Swing
Carpentry
Build Swing & Frame. ---
Dockbox
Carpentry
Remove inner boxes. Weatherproof outer box. Replace rams.
Thatch
Carpentry
Finish Tiki & 2 small cabanas. Thatch should arrive this week.
Under Master Storage
Carpentry
Sliding Doors for storage
Coffee Tables
Carpentry
Bases complete. One in place at S Palm for JE to choose finish color.
Staff Bathroom
Carpentry
First side frame is complete. Still need top decking.
Kitchen Baseboard
Carpentry
Needs new veneer panel.
Tiki Kitchen Roof - replacement
Carpentry
Repair or replace to prevent leaking. Ordering underlayment.
Solar Light Post
Carpentry
Do sample pedestal for solar light to prevent damage. -'
Install Stewart Screen
Carpentry/Electr Ready for install.
Media Center
Carpentry
Ready for assembly and install
Polaris ATVs
Daphne/Roy
850 expected at dealer by 4/19.550 by 5/13.
Research Equipment Rentals
Daphne
See what is available on island so we can completely projects in timely manner.
Sprouted Coconuts
Daphne
Inquired with Ken. Will see if Daphne can locate any on island.
Landscape Lighting
Electrical
Ongoing adjustment of lights, sensors and checks on transformers and bulbs.
Flagpole Landscape Lighting
Electrical
Make connections permanent (no extension cords).
Light Switch Cabana One
Electrical
Install new wireless light switch per
Install Broadband
Jermaine
Asked Jermaine to proceed.
Service Escalade for Larry
Jermaine
Take for Service.
Cell Repeater
Jermaine
Installed one in Capt. Office 4/19. Working out issues before kitchen install.
(Phones not reaquiring. )
Lights at Owner's Drive Entrace
Landscape
Secure cords,
Bury Landscape Light Cords
Landscape
Ongoing--Bury cords paying attention to not cover light sensors.
Irrigation at Basket
Landscape
Seems to be spraying wrong direction. Adjust.
Stone Wall Staff Bathroom
Landscape
One more day should finish
Heli Wall
Landscape
Hydroseed areas that were cleared during construction. Need Jules to Grade.
Sundial side road
Landscape
Move boulder.
Garbage Pit
Landscape
Hydroseed exterior side of berms.
EFTA00313656
LS.1 PUNCH LIST
Item
Department
Description
Completion Date
Pop's Garden
Landscape
Chris to review nursery set up.
Palms
Landscape
100 Trees from M. Daphne assisting with logistics. Chris to tag next week.
Bike Path to Flagpole
Landscape
Concrete at the top of the landing.
New Mechanical Building
Paint
Primer Complete.
MC Wooden Lawn Trim
Paint
Touch Up plaster and repaint.
Captains Office
Paint
Paint walls.
Laundry
Paint
Touch Up plaster and repaint.
Landing at Main Compound
Paint
Complete landing stonework.
Mooring Balls
Roy
Coming next week to see current set up and estimate for additional screws.
Fuel Truck
Roy
Estimate reasonable. Will do as soon as barge is operational.
Desk Chair
Sue
Coming on the plane next time.
Burn Permit
Not currently issuing. May start next month. Will check again then.
Oil Disposal
Will do as soon as barge is operational.
Road Bike Handlebars
Standard extension does not fit. Will price special order.
Pool Towels
brought sample and Steph has file of options.
Pool Ladders
Review problem and see if modification is possible.
Tank Hydro
4/15 - 4 Tanks out to be hydro-tested and refilled.
Fire Equipment
Will touch base again to schedule visit after JE departs.
Kawasaki Service
Puerto Rico tech declined. Checking local & Florida.
JCB Cylinder
Bosco working on it.
Mechanical Area Wall
Will use concrete form to make uniform.
Recover Chaises
Joseph Halliday picked up photos for a quote - expected 4/18 Plan to deliver
4/22. Daphne contacted this morning 4/20 to reconfirm Monday.
Reefco A.C.
Laundry/Captains-- Rich is going to discuss with Dave from Reefco.
Water Piping
Replace water run to pool cabana. In stock. Will do as soon as clearing complete.
Rug - Pool Cabana
April 23rd Arrival via tropical.
Melons
Plant melon crop in Pop's Garden. Seeds ordered 4/16. Will plant this week.
Take Escalade to Hangar for Larry.
Jermaine
Should be complete before Larry's arrival at 2:30.
4/20/13
Dump Truck
Will not start. Bosco preparing parts list for repairs.
4/16/13
Pool Cabana Washer/Dryer
Install Bracket. Have bracket as of 4/6.
4/17/13
5 Palms Pillars
Glue metal strips that have let go.
4/17/13
PRD Trailer
Needs new wheel. In progress.
4/17/13
Media Center - Relax Rm
Pick up at Tropical as soon as barge is operational.
4/18/13
Stewart Screen
Pick up at Tropical as soon as barge is operational.
4/18/13
Cleared area by 5 Palms
Hydroseed.
4/18/13
EFTA00313657
LSJ ITEMS AWAITING DIRECTION
Item
Pool Cabana Kitchen
Carpentry
Have reviewed with David. Need final notes from JE.
Crate to Zorro
Carpentry
Need list of items to go to know how big crate should be.
Beach Equipment Toy Racks
Carpentry
Which equipment? Beach or pool?
MC New Cabana?
Carpentry
Pergolas
Carpentry
Where?
MC Bike Path
Landscaping
Top of hill--rock, grass?
Exterior Clock Pool Cabana
Stephanie
Would you like to try something different?
Smart Desk Conference Set
Up (White) -Kitchen
3/6/13
Jermaine would like JE to advise.
Swing
Location in mind?
New Boat
Researching options.
Department
Description
Attachments
EFTA00313658
LSJ FUTURE ITEMS **Items under discussion for the future.
Item
Discussion Start Department
Estimate
Description
5 Palms Roof
3/16/13
Carpentry
Add roof to 5 Palms Office.
Sliding Doors for Relax Room
3/18/13
Carpentry/Elec
trical
JE to design new layout.
Library Book Shelf Lights
4/2/13
Electrical
Would like to redesign. Not a practical
application.
Landscape Timers
3/18/13
Electrical
Would like to upgrade landscape timers to
be more reliable and less sensitive to
power fluctuations.
Paint Repairs
Ian
Ian to continue pool cabana mural and
faux touch ups.
Solar--Toshiba
1/17/13
Jeanne
On site 2/17. Report showed 10 year
payback--Wind may be more practical
option.
Cell Tower
1/8/13
Jeanne
Jeanne & Darren spoke with G Caballero
giving coordinates of LSJ. Engineers do not
feel location is appropriate. Exploring
other options.
Video Receivers
Jermaine
All properties to be upgraded to the same
HDMI receiver.
Pool MC Steps to Pump Room
1/12/13
Landscaping
Low priority - approx 2 weeks work (under
#4)
MC- restain upper ceiling
Paint
Toolboxes/Tools
Roy/Bosco
Roy to review with Bosco and Mechanical
department.
Sofa - Pool Cabana
1/31/13
Was told JE would like to see rug in place
before deciding on color/style. Have ideas
available for review in NY.
Wall Unit - Pool Cabana
1/31/13
Was told JE would like to see rug in place
before deciding on color/style. Have ideas
available for review in NY.
New Doors Engineering
3/9/13
Investigate options Fiberglass
EFTA00313659
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00313656.pdf |
| File Size | 2546.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 7,328 characters |
| Indexed | 2026-02-11T13:26:28.664867 |