EFTA00314715.pdf
PDF Source (No Download)
Extracted Text (OCR)
Status Report
Date: 9/19/13
Location: 9 E
To JEE
From: MET
Items to be reminded of:
2nd Basement floor: mechanical room being painted.
1st Basement floor: kitchen floor permanently soiled; no garbage
disposal in sink; no control for stove exhaust fan at stove without ac
on (only control from Rich's office).
1st Floor: need to hose and pick up outside front door daily; front door
has worn spots/ key area scratched; oval office window blinds need
repair; there are various items sitting behind red sofa below main
staircase; no garbage disposal in kitchen sink; need full set of casual
dining ware for 12 with serving dishes; need silver coffee and tea pot
with matching sugar/creamers; dining room chair in corner to left
needs repair; dining room table tablecloth has multiple spots that will
not come out; need new dining room table cover underneath
tablecloth; two portraits in dining room do not have attached lighting;
consider closed cabinet with drawers for your things beside your dining
room chair; no curtains hanging in dining room.
2nd Floor: carpet in hidden kitchen is permanently stained; kitchen
light is out; lampshades in hidden bathroom torn; back stairway light
is out.
3 rd Floor: shower doors have chemical build up on them.
4th Floor: pink room rug and carpet permanently discolored; leather
chairs in other guest room are torn.
EFTA00314715
Mechanical update:
1. Fire alarm system control panel with all devices (smoke heads
with carbon monoxide sensors) being replaced by next Monday
9/23/13.
2. Chiller upgrade complete. Cooling tower installed; new
permanent motors to be installed by 10/1/13 - ones provided
need to be replaced.
3. JE Master BR- return system for air circulation ready for
approval. Allen Schwartz design/AD Winston install.
4. For reheat (heat exchanges) Siemens recommended change and
to provide quote. RB to install and wire; Siemens to program.
5. Nortech Humidifiers displays to be replaced; should be covered
by manufacturer.
6. 2013 Category Elevator Inspection to be performed by Allstar
Elevator, Otis and RB by 1/14.
7. Marantz Receiver repair- in process, just waiting on warranty
coverage approval from Marantz.
Staff:
Have reviewed duties and schedules of Lynn, 3030, Tess, and Rich.
Creating cleaning and maintenance schedules for 9 E; will be based on
zoning the residence for daily, weekly, monthly, quarterly, bi-annual,
and annual duties.
Creating household manual for 9 E that will cover administration,
housekeeping, culinary, valet, entertainment, maintenance, grounds,
travel and transportation, safety and security, and guest care.
EFTA00314716
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00314715.pdf |
| File Size | 98.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,668 characters |
| Indexed | 2026-02-11T13:27:19.082791 |