Back to Results

EFTA02260337.pdf

Source: DOJ_DS11  •  schedule  •  Size: 45.3 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: iak[ From: Sent: ed 1 /1 12018 6:07:00 PM Subject: Re: 1OF great! > On Oct 17, 2018, at 1:52 PM, Karyna Shuliak wrote: > Still waiting for Anthony to start on the bathroom redo, paint, and some other touch ups. They are finishing other tenants apartments. It has now been almost 3 weeks since I met him, which is the estimate time he gave me to wait. Will follow up with him and copy you. > Thank you. » On Oct 17, 2018, at 1:24 PM, wrote: » how is apt 1OF coming along? >> >» On Sep 27, 2018, at 11:09 AM, Karyna Shuliak wrote: >» >» Hi Anthony, >>> >>> We need to have work done in apartment 10F. The bathroom needs to be redone, bedroom window replaced, bedroom blinds fixed, some paint work in the closets. >>> When can we schedule a meeting to look at it together and figure out a plan? >» Please advice. >>> Thank you, >» Karyna > > EFTA_R1_01057228 EFTA02260337

Document Preview

Document Details

Filename EFTA02260337.pdf
File Size 45.3 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 903 characters
Indexed 2026-02-12T13:02:42.073647

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files