EFTA00722018.pdf
PDF Source (No Download)
Extracted Text (OCR)
Estate Report
Page 1 of
10 Horne Documents and Lasts Create She Settings Help
Select a View
All Events
Calendar
Current Events
f YE Report
Active ►rojects
ACtions
• Alert me
Export to
spreads beet
■ Modify ;flung%
and columns
ion* Ranch
Estate Report
]New (tern
Star us
Ptoj no.
Completed
IMO/Status
Info/Status
Inio/Status
Info/Status
Info/Status
liter ; :atom in Datsiheet
73ifinit to Outlook
prof Nome
lnlormabon
99 Returbrshment
Landscape Lights • NH
41 Remitted/ Leased
Land Business Lease
5/1 • Project Complete
Up to cpsleln Interests Invent*
PI
J
Responsibility Photo/Attch 3E Directive it Comment
Brice/Raren
No
5/4 • Awaiting dale for an on site
Snce/laten
NO
assessment for fees etc by NM State
SS New Estancia Fainter
4/29 • Contractor back on site to
Once/Karen
No
review 1stanti. *Corsi- Expel
estimate 5/2
103 Resealing Wood -
Stables & Adobe
IOS Exterior Stucco
Regain at MM
111 Refurbishment RC
Info/Status
112 Mech
Workshops/WW1 Pad
Construction
4/20 - Due to cold weather, start
Once/Karen
No
date expetted mid May
5/1 • Received eiltrate, will review & Elnee/itaren
NO
forward ASAP
514 • Pickets around Adobe removed. Brice/Karen
Yet
Vita imolai, Ines Installed 6
electrical retuned deeper. Attached
photo
5/4 • Project on hold until after visit
&ice/Karen
NO
tittp://ss ehsn 01 .nys.iocal/rorrolListtJF:statr%20Repon/JE% 20Repottaops1ShussInCirith:FIIIIL
5/4/2009
EFTA00722018
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00722018.pdf |
| File Size | 80.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,472 characters |
| Indexed | 2026-02-12T13:51:39.847035 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.