Back to Results

EFTA00722022.pdf

Source: DOJ_DS9  •  other  •  Size: 140.9 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

Estate Report Page I of I al Home Documents and Lists Create Site Settings Help Up to Epstein Interests Intranet Select a View All Events Calendar Current Events JE Report Active Projects Actions Alert me o Export to spreadsheet o modify settings one columns Zorro Ranch Estate Report PI riNew Item I AFilter I :2Edit in Datasheet I IlUnk to Outlook Status Proj No. Proj Name Info/Status 41 Permitted/Leased Land - Business Lease Info/Status Info/Status Info/Status 55 New Estancia Fountain 103 Resealing Wood - Stables & Adobe 105 Exterior Stucco Repairs at MI Info/Status 111 Refurbishment RC Info/Status 112 Mech Workshops/Wash Pad Construction Information Responsibility Photo/Attch JE Directive JE Comment 5/26 - Contacted NM State, they Brice/Karen No hope to have a firm date for an on site assessment for fees etc within a month 6/1 - Contractor was unable to make Brice/Karen No 5/28 meeting, will be on site 6/3 6/1 - Power washing & prep work Brice/Karen No has started on Stables 6/1 - Contractor was unable to be Brice/Karen No keep meeting 5/28, will be on site 6/3 6/1 - Bracing posts have been installed around 50% of Adobe irrigation installion continues 6/1 - Project win begin when man Brice/Karen No power is available Brice/Karen No httn://wehsrv0lhnrro/1.isls/Fctate%20Rennrtt.IF.%20Rennn :mx?ShnwItinrid=l ITMT. 611/2009 EFTA00722022

Document Preview

Extracted Information

Locations

Document Details

Filename EFTA00722022.pdf
File Size 140.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,424 characters
Indexed 2026-02-12T13:51:39.941258

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files