Master Suite Expansion Preliminary Budget LSJ Performed Work June 5 , 2009 Subcontractor performed work Total costs Phase Description Qty Unit Price Shipping Sub Material Labor Totals General Conditions $18,300.00 01-514 01-522 01-610 01-621 01-624 01-645 01-665 Phones 6 mos $300.00 $0.00 $1,800.00 Temporary roof protection 1 tot $2.000.00 $0.00 $2,000.00 Material Handling 4 wks $600.00 $0.00 $2,400.00 Temporary Protection 1 tot $1.500.00 $0.00 $1.500.00 Construction Cleaning 10 wks $300.00 $0.00 $3.000.00 Expendables 4 mos $900.00 $0.00 $3.600.00 Equipment Rental 4 mos $1.000.00 $0.00 $4.000.00 )nspections/Teseng $9.500.00 02-000 02-000 02-000 02-000 02-000 02-000 02-000 Krauss Manning - Subcontractor $9,500.00 $9.500.00 Rebar inspections Concrete placement inspections Concrete test cylinders Close in inspections Electrical inspections Plumbing inspections 02-005 Survey SUB Mosley 1 total $3,500.00 $0.00 $3.500.00 $3.500.00 02-071 Demolition Remove / Dispose outdoor bathing area 200 sf $2.00 $400.00 Excavate for slab & foundation 1800 cy $1.00 $3,600.00 Remove exterior walls 500 sf $2.00 $1,000.00 Remove interior walls Remove exisitng roof 1928 sf $2.50 $4.820.00 Cap existing utilities 5 ea $50.00 $250.00 Remove / Dispose all exterior doors. windows and shutters 15 ea $25.00 $375.00 Remove / Dispose existing terrace rails and posts 'I hrs $15.00 $15.00 Remove / Dispose existing terrace columns 19 ea $20.00 $380.00 Remove / Dispose existing elevated terrace beam 300 sf $5.00 $1.500.00 Remove dumpster debris from island - roof debris - conduit-doors-shutters 4 ea $800.00 $3.200.00 $15,540.00 Shoring 400.00 01-150 Build wall (shoring) full length of terrace 800 sf $8.00 $6,400.00 02-281 Pest Control Post control $2.260.00 $2.260.00 Concrete $25,028.00 03-120 03-130 03-173 Foundation labor 50 cy $150.00 $0.00 $7,500.00 4000# concrete 50 cyd $170.00 $0.00 $8,500.00 Slab on Grade - Labor 660 sf $7.00 $0.00 $4,620.00 4000# concrete - slab 12 cyd $170.00 $2.040.00 Rear wall/retaining labor 7.4 cyd $150.00 $1,110.00 4000# concrete 7.4 cyd $170.00 $1,258.00 'Masonry $33,801.00 04-220 04-221 CMU Labor 1782 ea $2.00 $0.00 CMU material 1782 ea $3.50 $3,564.00 $6.237.00 EFTA00731166 04-450 04-451 Native Stone Veneer labor 1600 sft $15.00 $0.00 $24,000.00 Native stone material 1600 sft $0.00 $0.00 Metals 10,820.00 05-050 05-500 05-500 Metal Fastening $3.000.00 $0.00 $2.500.00 $2.500.00 Lintels - Labor $320.00 $0.00 $320.00 Lintels - Material $5.500.00 $0.00 $5.500.00 Wood Framing $105,350.00 06-050 Roof& Porch framing - Bluestone $75,000.00 $75.000.00 06-100 06-130 06-200 06-202 Wood Railing 110 LF $75.00 $0.00 roof t&G planking material 1910 sf $10.00 $0.00 small closet & bath Ceiling install 120 sf $10.00 $0.00 smallcloset & bath Ceiling materials 120 sf $15.00 $0.00 $8.250.00 $19,100.00 $1.200.00 $1.800.00 06-400 c ectura woo wo Running trim 45 If $50.00 $2.250.00 Vanities 3 ea $5.400.00 $0.00 $16.200.00 Roof $84,744.00 07-240 07-413 Cornice 236 le $50.00 $0.00 $11,800.00 Metal Roofing • Labor 515.00000 07-412 Roofing & insulation -mat & labor $31,344.00 07-623 Copper Flashings • Labor $5,900.00 07-623 07-900 Copper Fleshings - Material Joint Sealants - material $17,700.00 $3.000.00 Doors and Windows $88,068.00 08-210 08-210 08-211 08-610 08-610 Shutters 8 ea $2.041O0 $0.00 Doors exterior 8 ea $4.083.00 $0.00 Int. Doors & Frames 3 ea $2.232.00 $0.00 Windows - Material 1 tot $1,200.00 Window Shutters 1 ea $750.00 $0.00 $16.328.00 $32.664.00 $1.200.00 $6.696.00 $750.00 08-215 GlassSliding doors 2 ea $3.500.00 $7.000.00 08-215 Role down shutters 2 ea $5.000.00 $10.000.00 08-710 Finish Hardware - Labor $2.500.00 $2.500.00 08-710 Finish Hardware - Material 1 total $8.500.00 $0.00 Reuse existing shutter hardware 50.00 $8.500.00 $0.00 08-810 Mirror Glass - 54 sft $45.00 $0.00 $2,430.00 Finishes $50,776.00 09-200 09-300 09-300 09-300 09-300 09-500 cement coating 400 sft $2.50 $0.00 Wall Stone Tile - Labor 1600 sft $2.50 $0.00 Wall Stone Tile - Material 1600 sft $2.50 Stone Stone tile Flooring • Labor 1172 sft $2.50 $0.00 Stone stone tile Flooring Material 1172 sft $2.50 Small under AC Wood Ceilings 1 tot $2.500.00 Small under AC Wood Ceilings material $6.500.00 $1,000.00 4000 $4.000.00 $2.930.00 $2.930.00 $2.500.00 $6.500.00 09-560 09.600 refinish exisitng Wood Flooring 488 sft $7.00 $3,416.00 Granite Countertops/ tub slabs/steam MOM 75 sft $100.00 $0.00 $7,500.00 09-910 09-920 Exterior Painting 1 tot $5.000.00 $0.00 $5.000.00 $5.000.00 Interior Painting 1 tot $0.00 $3.500.00 $2.500.00 Specialties Roburn medicine cabinets 2 ea $650.00 $1,300.00 $15/3&00 Glass Shower 1 allow $4.500.00 $0.00 $4,500.00 Glas steam room 1 allow $5.600.00 $5,600.00 soap trays 4 ea $317.00 $1.268.00 towel rods RTTB 24 6 ea $275.00 $1.650.00 toilet paper holders 1 ea $150.00 $150.00 rob hooks RTRH 6 ea $95.00 $570.00 Toilet Accessories • Labor 14 ea $50.00 $0.00 $700.00 Steam Room Equipment $7.6151 13-130 Stoamist system 30 1 total $7.615M0 $7.615.00 EFTA00731167 Plumbing 15-400 Piping, rough in 9 ea $1,000.00 Sign off Faucet sets Waterworks RTLS01 3 ea $1.177.00 Lays - waterworks MRCU! 3 ea $507.00 Shower bodyWaterworks RTSV58 2 ea $827.00 Shower head RTSH72 2 ea $587.00 Tub - Waterworks claw40 1 ea $5.975.00 $32,280.00 $9.000.00 $2,500.00 $3.531.00 $1.521.00 $1.654.00 $1.174.00 $5.975.00 15-450 Tub filler Waterworks RTTU89 1 ea $2.085.00 Propane instant hot water heater 1 ea $1.000.00 Booster Water presure pump 1 ea $1.300.00 Presure tank for booster 1 ea $125.00 Toilets toto -TOWA20 3 ea $805.00 $2.085.00 $1,000.00 $1,300.00 $125.00 $2.415.00 HVAC $42,798.00 15-800 Remove and relocate exisitng AC condensing units - $2.600.00 I -air handler for the existing Master Bedroom. ICP witxv and high efficiency blower motor, cool only $2.805.00 1-ICP 2 stage NC condensing unit for 'Master Bedroom" 18seer $3.905.00 $2.600.00 $2.805.00 $3.905.00 1-air handler for the" Expanded BathfSpearea $2.805.00 1-ICP 2 stage NC condensing unit for 'Expanded BathfSpa* areal6 to18 seer $5.385.00 2-ultra violet biocide units @ $525 and $835 $1.360.00 $2.805.00 $5.385.00 $1.360.00 2-EAC Honeywell air cleaners@ $940.00 and $1053.00 $1.993.00 2-overflow pans. auxiliary condensate pumps, thermostats $1,470.00 Dave Gott 1-NAC Labor $20.475.00 $1.993.00 $1.470.00 $20.475.00 16-000 Electrical New 200 amp service from kitchen 1 ea $1,000.00 Overhead lights 6 ea $200.00 Supply outside canister lights 4 ea $200.00 Supply recessed lights 4 ea $100.00 Vanity lights 6 ea $250.00 switches,outlets GFIs, cable. miso. 1 total $7.500.00 exhaust fan 1 ea $300.00 Labor 150 hr $32.23 $1,000.00 $1,200.00 $800.00 $400.00 $1,500.00 $7.500.00 $300.00 $4,834.50 $21,534.50 Sign off Glidden 1 sub $t500.00 $1.500.00 16-700 Communications 1 allow $2.500.00 $0.00 $2.500.00 Sub Total $592,502.50 $275,046.00 $175,938.00 $141,518.50 Contingency. 5% $29,625.13 $13,752.30 $8,796.90 $7,075.93 Total $622,121.63 $288,798.30 $184,734.90 $148,594.43 $592,502.50 $29,625.13 $622,127.63 Landscaping not included Furnishings not included General Conditions does not include costs for Supervisors, Project Managers or Project Assistants. EFTA00731168

Document Preview

Document Details

Filename EFTA00731166.pdf
File Size 200.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 7,847 characters
Indexed 2026-02-12T13:53:27.132765

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files