Jeffrey, The following proposal is based on Gensler schematic drawings dated 2/26/09. A revised Budget will be issued after the Design Development Plans are submitted by the Architects and again after the Construction Documents are submitted, The attached schedule shows the critical path of information & construction in red. A new Schedule will be submitted with each new Budget. General Conditions $135,400.00 Sitework $599,900.00 Concrete $3,026,120.00 Masonry $590,000.00 Metals $392,410.00 Wood $770,000.00 Moisture / Thermal $523,930.00 Doors and Windows $615,320.00 Finishes $882,000.00 Specialties $44,500.00 Special Equipment $754,000.00 Furnishings $0.00 Special Construction $350,000.00 Mechanical $1,100,000.00 Electrical $725,000.00 $10,508,580.00 EFTA00731173

Document Preview

Extracted Information

Dates

Document Details

Filename EFTA00731173.pdf
File Size 35.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 811 characters
Indexed 2026-02-12T13:53:27.200131

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files