Punch List —June 1, 2012
1. Five Palms —TOP PRIORITY
- Laying conduit and pulling cable — continues
- Exterior Door Shutters — PO rejected by JE, on hold awaiting design
- Painting — inside completed 5/30
Outside to be completed after visit
- Furniture — Sofa — leather samples JE will review while on site
- Desk, Rug, Lamps installed
- Lights— Parrots finished, awaiting approval on down lights
- Mirrored siding — Panels ordered
Glue on site
- Tapestry Molding for Ceiling — bid rejected, need to review design with JE
- Transformer building - Building 5/31, 5/25 - final electrical hookup 6/8 — temporarily powered by generator
- Flooring — installed
- Fire pit —gas and grate coming down on plane
- Books —books on site will relocate over the week of 6/4
2. Grotto -
- Genset wiring — scheduling to be determined
3. Berm —4 large planter boxes with small planter inside require construction — size to be determined by JE
- cleanup and excavate — continues
- hydroseed — continues
- remove rock screener - completed
4. Engineering/Maintenance Yard
- Steel Shed — foundation in progress
- Metal Sheets on old building will be replaced week of 6/4
5. Triangle — landscaping direction required from JE
6. Flagpole Pool Cabana -
- Recovering of sofa/chairs — completed, need to review piping with JE while on site
- Furniture - review another piece of furniture — Sarah
7. Entry Tree Lights — installation complete
8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction , wall built
9. Tiki - shields with the vendor in Wewak (5/4) — working on the permit to export — will take 1 to 2 weeks
10. Dock —
- Decking — replace all damaged boards and carpet complete
- Floating Dock -
- Jet ski Docking - review
- Table/Dock Box — Bill starting 6/4
11. Kite House — review of wooden outside furniture - Sarah
12. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
13. Chilax Bathroom - requires blue rugs for bathroom & vanity area — Sarah
14. Mechanical Building
- Replacement Transformer — approved to purchase — ordered
15. Boats
- Midnight Express — purchase Yamaha 300 motors, install by Offshore Marine
- PRD— sell
- Lady G — sell
- Big N - sell
- Calypso — refurbish
16. Gym Road - road grading after Five Palms — continues
17. Outside Master Bedroom — lock installation 6/2
EFTA00522048
18. Timers — review installing timers on air conditioners, irrigation water systems, and lights
19. Life vests — new life vests, yellow and black, in men's and women's sizes — at least 2 of each, if not 4 in
unisex size so they can be exchanged - Sarah
20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
21. Pergolas — construct 3 pergolas for benches at the top of the hill —continues
23. Main entrance/ gravel/grade - complete
EFTA00522049
Document Preview
Extracted Information
Dates
Document Details
| Filename | EFTA00522048.pdf |
| File Size | 90.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,919 characters |
| Indexed | 2026-02-11T22:21:52.079110 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.