Punch List — May 4, 2012
1. Flagoole Pool Cabana -
- Recovering of sofa/chairs - to be completed via JE direction in May
- Furniture - review another piece of furniture — Sarah
- lighting - more down lights outside
2. Main Compound -
- Landscaping — purchase goat's foot vine on hillside —investigating options/price forwarded 5/4
- purchase Bougainvillea (bright red) for Basket; fill in front of basket with more dirt
- repairing of coral stone deck areas
- coral stone thresholds in guest rooms need to be cut
3. Five Palms-
- Electrical/Phone/Data — reviewing in house option — pull boxes
- Exterior Door Shutters - require JE approval
- Interior Doors — due on site 5/21
- Painting —final outside coat to be completed once all work is finished
- Waterproofing
- Furniture — X 2 cannonball lamps, bronze lamp — on site
r
i
of 7 rn
- Sofa — purchase
- Built in Cabinets/shelves — to be completed by Bill — hinges due NYC 4/30 (Karen will bring down)
- Landscaping — level dirt - continuing
— relocate grasses — continuing
- lights— outside light boxes on back and front walls to be covered over
- Light parrots and building —from roof line (rectangular 24 X10)
- Mirrored siding — sailing from FL 5/4, due on STT 5/8
- Framed Photos — JE to review 4/30
4. Grotto -
- Pavilion — painting to begin 5/1 - white
- Landscaping — more dirt required on left hand side as you look down, then hydroseed
- Shutters/generator doors/storage doors—???
5. Hangar —
- Concrete Floor - grinding ongoing
- Painting — interior paint selected
- painting floor — completion 5/3 — delayed due to power issues
- Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ
6. Steel Shed —ABC Concepts proposal forwarded to JE 4/24 — redesign in process
7. Triangle — needs to be reconfigured, with more dirt on top and less around base
- more concrete required around edge
- additional road
8. Entry Tree Lights — lights on site
9. Solutions for Generators — Sound proofing solution forwarded to JE, require direction
10. Top of hill — CLEAN UP — remove rocks - ongoing, and hydroseed
11. Tiki - Shields —with the vendor in Wewak (5/4) — working on the permit to export —will take 1 to 2 weeks
12. Sunken Garden Berm — crusher runs - place inside berm area
- 4 large planter boxes with small planter inside require construction — size to be
determined by JE
13. Engineering—Clean Up —area needs to be leveled and metal shed to be laid out
- Landscaping —planting Sea grape
EFTA00522064
14. New vehicles — two more Polaris bikes (800's) — Larry/Brice
15. Dock —
- Entry — redo entry — Brice to source dock wood locally
- Decking - discuss pressure treated timber/carpeting
- Floating Dock— design required
- Jet ski Docking - review
- Table— final size/design to be determined — coral stone top — Bill
- Old floating dock — moved to engineering, requires redesigning
16. Mooring Permit — estimate to place anchors forwarded to JE 4/10 - awaiting direction
17. Telephone system — remove/add speed dial - programming disc on LSJ 5/1
18. Gates - Thatch needs to be applied to lower gates — both to be painted
19. Guest House at Beach 3 — sited, needs to be roughed out — start 4/21
20. Kite House — review of wooden outside furniture - Sarah
21. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
22. Chilax Bathroom - requires blue rugs for bathroom & vanity area — Sarah
- put weather stripping at a minimum on bathroom door (as it is flooded) or change swing
with threshold
23. Mechanical Building
- Replacement Transformer — approved to purchase, forwarded to Rich K, who has requested an E Mail from JE
with approval
24. Boats
- Midnight Express — 4/2 approved to purchase Yamaha 300 motors, to be installed by Offshore Marine
- ship existing motors to FL, LV to sell — shipping 5/10
- PRD — sell
- Lady G — sell
- Big N - sell
- Calypso — refurbish
25. Sundial —
26. Hydro seeding— as much as possible especially when it rains
27. Gym Road - road material & holes in stone wall need to be added for water drainage — work continues
28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30
- bedroom door to outside to be adjusted and lock added
29. Entry basket — bougainvillea to be purchased for Basket and dirt added in the front
30. Nautilus (Main courtyard) area - requires cement band to continue
31. Relocate Tom's Trailer — area to be used for employee bathrooms
32. Move beach trees
33. Compass— hydroseed — 4/30
34. Sombrero ramp
M. Landscaping— bananas and bougainvillea
36. Timers— review installing timers on air conditioners, irrigation water systems, and lights
37. Life vests — new life vests, yellow and black, in men's and women's sizes — at least 2 of each, if not 4 in
unisex size so they can be exchanged - Sarah
38. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
- fix large broken light
*6ft grader - Jules
EFTA00522065
Document Preview
Extracted Information
Dates
Document Details
| Filename | EFTA00522064.pdf |
| File Size | 153.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,052 characters |
| Indexed | 2026-02-11T22:21:52.283844 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.