EFTA00584527.pdf
Extracted Text (OCR)
JE Punch List —July 9. 2012 Directives
1. Clean up
- Shed and its Workshops
- Make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- Buy new Kawasaki bikes and mules
3. Computers
- Buy new computers
4. Five Palms
- Chains hung at Five Palms
- Internet — Danny and Little Danny terminating fiber — completed and light tested 6/29
- Jermaine will confirm internet and phones after the CISCO 3560 switch is installed — switch ordered
7/5 — EDA at 71st on 7/11
- Exterior Door Shutters — removable option required - hurricanes
- Painting - outside to be completed via JE direction
- inside to be completed via JE direction
- Furniture — Sofa — leather sample selected by JE, will review when next on site
Outside furniture ordered
- Tapestry Molding for Ceiling — Ion
- Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator
- Fire pit — Burner and plate on site — starter/igniter is missing have contacted company new one to be sent
- Cabinets — add push latches on doors — still to be installed
5. Grotto
- Floor resin white — due to no water/cleaning issue - review Spanish Tile option, some on site
- Genset wiring — scheduling to be determined
6. Berm/Top of Hill
- Paint — will move forward when dry
- Entry rocks - COMPLETE
- Wood boundary — 12ft boxes around trees after shield installation
- Electrical - Panel Low Lighting to be completed — waiting for transformer
7. Engineering/Maintenance Yard
- Metal Sheets - on old building will be replaced during upcoming visit
- Engineering storage & shelving— work to start when carpenters available
8. Triangle — landscaping direction required from JE
9. Flagpole Pool Cabana -
- Furniture —glass desk from NYC set up 6/29 - JE to review
- relocation of existing desk to the Chillax room - JE to review
10. Floating dock
- Jet ski dock-
- Wooden fenders — COMPLETE
- Table/Dock Box
- table/seat top last coat of sealer applied 6/28
- draw baskets, doors & hinges all on site
- draw sliders/hardware at 71st Rich B is forwarding — on site 7/2
- completion expected 7/6
EFTA00584527
11. Entry Tree Lights — COMPLETE
12. Solutions for Generators — wall built, soundproofing on LSJ 7/6
13. Tiki — Darren is contacting the vendor regarding the shields — require update
14. Kite House — review of wooden outside furniture - Sarah
15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
16. Chillax Bathroom - requires blue rugs for bathroom & vanity area — Sarah
17. Mechanical Building
- Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21
18. Boats
- Lady G (Fat Cat) - refurbish
- Midnight Express — in water
- Lady K - sell
- Big N - sell
- Calypso — sold
19. Timers— review installing timers on air conditioners, irrigation water systems, and lights
20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
21. Main compound
- Wind doors - on kitchen side needs openers and wind door stops — Brice purchasing in NM
22. Landscaping —Josephine to visit and organize garden
23. Solar lights - Brice to order 500 landscape lights — schedule for solar lights
- should be placed every 30 feet - order
24. Roads — grade - Jules work continues
25. Library
- Lights on bookshelves need attention — will review with Danny
- Temperature - STABLE
26. Main hill
- Asphalt path — edge and end asphalt properly - proposed suggestion forwarded from Monique
27. Master Suite
- Large master bed planting
- Put self-closing hinges on the master bedroom door to the outside —
- A
- Night lights to master from kitchen do not work
28. New Employee Bathrooms
29. Gym
- Add new doors in yoga and ballet room closets — COMPLETE
- New punching bag — due 7/9
- Clean up electronics/stereo - Jermaine
30. Benches
31. Office Pavilion - East window in Sarah's office is rusted outside - COMPLETE
32. Danny Vicars — schedule boat driving lessons
33. Heli Pad — fix and replace lighting — COMPLETE 7/5
34. Hangar
- Jermaine to redo internet at hangar — quotes expected 7/6
- Hangar pad to be built
-E.rci:!,117-1U.;in: MEM
EFTA00584528
Document Preview
Document Details
| Filename | EFTA00584527.pdf |
| File Size | 139.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,248 characters |
| Indexed | 2026-02-11T22:50:27.133858 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.