Back to Results

EFTA02340007.pdf

Source: DOJ_DS11  •  email/external  •  Size: 45.5 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Larry Visoski Sent: Thursday, February 5, 2015 1:04 PM To: Je vacation Subject: Boeing A check Jeffrey Larry Morrison infor=s the earliest our Palm Beach maintenace team (American Airline mechanics) c=uld start on Boeing A check is Feb 15 and 16th., and complete the work Feb 2=st and 22nd. Total of 4 working days to complete inspection, thes= Mechanics work full time for America airlines and assist with Boeing maint=nance., Are these dates still approved? =hx Larry Larry, The earliest Joe can start the A Check on Atlantic's r=mp on 2/15 <x-apple-data-detectors://0> and 2/16 <x-apple-data- detectors://1> . Hangar and ramp are unavailable th=t weekend (President's Day) at Jet Aviation. The airplane will then be put i= Jet Aviation hangar the following weekend to complete the external items o= the Check. Larry M. Sent from my iP=one 1 EFTA_R1_01304129 EFTA02340007

Document Preview

Document Details

Filename EFTA02340007.pdf
File Size 45.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 902 characters
Indexed 2026-02-12T15:03:27.126764

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files